Free roofing receipt template
A roofing receipt with 11 common line items already listed, each with its unit, and room for how the client paid and what’s still owed. Keep the lines the payment covers and send it.
Free, no sign-up. Amounts are left blank for the payment you received.

What’s on a roofing receipt
Every line is one part of the roofing job, listed on its own so the client can see exactly what their payment covered.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Asphalt shingle roof tear-off and disposal | per sq ft | Tear-off depends on the layers coming off and the dump fees, not on the new roof, so it’s priced on its own. |
| Roof sheathing replacement over rafters | per sq ft | Rotten decking only shows after tear-off. A per-square-foot line lets you state an allowance and the price beyond it. |
| Install synthetic roof underlayment | per sq ft | Underlayment covers the whole deck and is priced by area, separately from the shingles over it. |
| Install ice and water shield at eaves and valleys | per linear ft | Measured along the eaves and valleys, and required by code in many cold-climate areas. |
| Install aluminum drip edge | per linear ft | Edge metal runs around the eaves and rakes and is priced by the foot. |
| Install architectural asphalt shingles | per sq ft | The field shingles are the biggest line, priced by area including pitch and waste. |
| Install hip and ridge cap shingles | per linear ft | Cap shingles are counted by the foot of hip and ridge, not by area. |
| Install shingle-over ridge vent | per linear ft | Ventilation is its own choice. Listing it shows the client what keeps the attic dry. |
| Install pipe boot flashing at vent stack | each | Flashings are priced each, so the number of pipes on the roof shows in the price. |
| Reflash chimney with step and counterflashing | each | Chimney flashing is slow, detailed work at a common leak point, so it gets its own line. |
| Final cleanup and magnetic nail sweep | each | Homeowners worry about nails in the driveway. Naming the sweep shows it’s included. |
Your roofing receipt in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Name what it pays
Write the number of the invoice or quote the payment is for, and whether it’s a deposit, a progress payment or the final payment.
- 3
List what it covers
Keep the lines the payment covers, with the quantities in square feet, linear feet and each and the prices from the invoice, and delete the rest.
- 4
Record the payment
Fill in the date paid, how the client paid with the check number or reference, and any balance still owed. Save it as a PDF and send it.
How roofing jobs get paid
A reroof is usually paid in two parts, and each needs its own receipt. The deposit receipt should say it’s a deposit against the signed quote, what it pays for, such as the shingle order and the dumpster, and the balance still owed after it.
Insurance claims add a third party to the payment. The homeowner may pay you with a check made out to them and their lender, or pay in stages as the insurer releases funds. Write a receipt for each payment with the check number, who it came from and which part of the work it covers. The insurer or lender may ask for proof the roof was paid for before releasing the rest.
On the final receipt, record the roof that went on: the square feet installed, the shingle line and color, the underlayment, the date finished and the workmanship warranty. Homeowners keep it with the house papers, and it’s what a buyer’s inspector or a future warranty claim will ask to see.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This receipt records the payment shown for the invoice or quote named above.
- Workmanship warranty: ____ years from completion. Shingles carry the manufacturer’s warranty.
- Any balance still owed is written under Payment details.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Roofing receipt template FAQ
01Is this roofing receipt template free?
02How do I show a deposit or a partial payment?
03Can BuildWell send receipts for me?
04How do I write a receipt for an insurance-funded roof?
05Should the roofing warranty go on the receipt?
06What if the homeowner pays the roofing deposit in cash?
Browse by format
- Receipt template for PDF
- Receipt template for Word
- Receipt template for Excel
- Make a receipt online
- Roofing estimate template
- Roofing invoice template
- Roofing quote template
- Roofing software
Guides for roofing receipts
Browse by trade
- Plumbing receipt template
- Bathroom remodeling receipt template
- Kitchen remodeling receipt template
- Electrical receipt template
- Painting receipt template
- Drywall receipt template
- Flooring receipt template
- Handyman receipt template
- Carpentry receipt template
- Concrete receipt template
- Deck and fence receipt template
- Siding receipt template
- Window and door receipt template

Price your next roofing job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.