Estimating software that prices jobs in minutes
Describe the job by voice, text or photos. Get an itemized estimate priced with local materials and labor, ready to send.

Estimating software, in short
- Itemized lines with labor and materials on each
- Materials priced at stores near the job
- Labor at your area’s wage for each trade
- Your overhead, markups, sales tax and permit fee
- Change any line before you send
- Clients read and sign on their phone
From a description to line items
Tell BuildWell what the job is: “gut the hall bath, tub to walk-in shower, new vanity and toilet, tile to the ceiling.” Say it out loud while you walk the job, type it, or add photos.
BuildWell asks the few questions that change the price, such as who supplies the vanity. When the plan of the work looks right, it builds the estimate line by line.
- The plan shows the work in the order it happens
- Each line is a unit of real work with its own labor hours and materials
- Lines like demolition, rough-in, cement board, waterproofing, tile and fixtures
- Change any quantity, hour or price
- Add a line, or delete one you don’t need

Every price backed by local data
The AI decides what the job needs and how much of it. Real data sets the prices.
When a material has no store price, the estimate says so plainly. Any suggested price is marked as a suggestion, and you confirm it or enter your own before the estimate can be sent.
- Materials matched to real products and priced at a store near the job’s ZIP
- Store prices checked within the last 30 days
- A link to where each material price came from
- Labor at each trade’s median wage in your metro, from the Bureau of Labor Statistics
- Your overhead and markup added on top of the wage
- Nothing goes to a client with a blank or unchecked number on it

Labor priced trade by trade
A bathroom remodel isn’t one wage. BuildWell plans each trade’s hours at that trade’s local median rate where the job is.
If the plan doesn’t match your crew, change it. Price your time and your materials the way your business actually works.
- The plumber’s hours at the plumber’s rate
- The electrician’s hours at the electrician’s rate
- The tile setter’s hours at the tile setter’s rate
- Crew faster or slower than the plan? Change the hours
- Pay more than the local median? Change the rate
- Your edits stay on that estimate, and the totals update as you type
- Labor markup and overhead are set apart from material markup

Your numbers, your settings
Set your pricing once, and every new estimate starts with it. Change it on any one estimate when a job calls for it.
When you type in your own price for a material, BuildWell remembers it and uses it on your later estimates. Your pricing builds up as you work.
- Labor overhead, labor markup, material markup, sales tax and permit fee
- Separate material and labor markups
- A percentage discount on the whole job, before tax
- Sales tax on materials, preset for the job’s location
- Client-supplied items listed at no charge
- Export any estimate as a CSV file

A catalog when you want to build it yourself
Not every estimate starts with the AI. Build lines from the catalog, write your own, and mix the two freely on the same estimate.
Group lines by job step so the client sees the work in order. Then choose how much detail the printed estimate shows.
- Search BuildWell’s catalog of units of work
- Catalog lines come with their labor and materials already planned
- Write a custom labor or material line with your own price
- Show or hide quantities, unit prices, discounts and tax, each on its own

Revisions that keep the paper trail
Clients change their minds. When they do, revise the estimate instead of starting over.
Before you send, nothing is locked. Once it’s sent, the estimate is read-only, so what the client is reading on their phone is always what you meant to send.
- BuildWell keeps the original estimate
- The old link is retired, so the old price can’t be signed by mistake
- You get a new version to edit and send for a fresh signature
- You always know which price the client agreed to, and when
- Before sending, change lines, the client or the look as often as you like

Sent, signed and tracked
Text or email the estimate as a link, with your own message, from your own number or email address. The client reads it on their phone with your logo and terms.
If you’re sitting at the kitchen table together, collect the signature in person on your phone instead.
- The client accepts and signs with a finger, or declines
- You see when they open it and how many times
- You get a notice when they decide

From estimate to invoice without retyping
Once the estimate is signed, create the invoice from it. Ask for a deposit when you send it.
- The labor, materials and permit lines come across grouped by job step
- The discount and tax carry over
- Clients pay by card or bank transfer from the invoice link when you’ve connected Stripe

From walkthrough to signed estimate
- 1
Describe the job
Talk, type or add photos. BuildWell asks only what changes the price.
- 2
Check the plan
See the work in order. Edit it, or tell the AI what to change.
- 3
Review the prices
Every line has local material and labor prices. Change anything until it’s your number.
- 4
Send it for a signature
Text or email a link. The client opens it and signs on their phone.
By hand vs with BuildWell
The same bathroom estimate, done the old way with a notepad and a spreadsheet, and done in BuildWell.
| The job | By hand | With BuildWell |
|---|---|---|
| Listing the work | Write the scope from memory, then hope nothing’s missing. | Describe the job; BuildWell plans each unit of work in order for you to check. |
| Pricing materials | Look up prices store by store, or reuse last year’s numbers. | Materials priced at stores near the job, checked within 30 days. |
| Pricing labor | One hourly rate for everything, whatever the trade. | Each trade’s local median wage, plus your overhead and markup. |
| Adding it up | A spreadsheet or a calculator, and a second pass to catch mistakes. | Totals, tax, discount and markups update as you edit. |
| Getting a yes | Attach a PDF, then call to ask whether they’ve read it. | A link they sign on their phone, with a notice when they open it. |
| Making a change | Rewrite the estimate and lose track of which version they saw. | A revision that keeps the original and gets signed again. |
Built for your trade
Line items, labor hours and local prices for the work you actually do.
One plan. Every feature.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Free tools to go with it
Generators, templates, calculators and guides. No sign-up.
Estimating software FAQ
01Which trades does BuildWell estimate?
02How accurate are the prices?
03What happens when a material has no local price?
04Can I add my own line items?
05Can I see where a material price came from?
06Can I get an estimate out of BuildWell?
07Does it work in Spanish?
08Can I estimate from my computer?
09How do clients approve an estimate?
10How much does BuildWell cost?
More of BuildWell
AI estimates
Describe a job by voice, text, photos or a floor plan. AI plans the work and quantities; prices come from local stores and BLS wages, and you confirm any gaps.
Learn more →Quote software
Price a job from local material prices and your area’s labor rates, send the quote as a link, and get it accepted and signed on the client’s phone.
Learn more →E-signature app
Clients sign your estimates with a finger on their phone, from a link or in person. Name, signature and date go on the document. No app or account for them.
Learn more →Invoicing software
Turn a signed estimate into an invoice, bill deposits and progress payments, send a link clients pay from, and see what’s still owed. Built for contractors.
Learn more →Deposits and progress payments
Ask for a deposit from 5% to 90% when you send the invoice, then bill the balance or the next payment. Every partial payment is recorded and added up for you.
Learn more →Estimate templates and branding
Six built-in designs for estimates and invoices. Add your logo, color, license number and terms, and every document matches, on the PDF and the client’s link.
Learn more →
Try BuildWell today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.