A framing price is built from five pieces:
- Walls and openings: linear feet of wall, plus each door and window.
- Floors and ceilings: joists, blocking and subfloor, by the square foot.
- Roof: trusses or rafters, and the roof sheathing.
- Sheathing, wrap and structure: the outside skin, headers, beams and shoring.
- Setup and cleanup: staging the lumber and cleaning up the cut-offs.
Take off the walls, then the extras
Measure each wall run, plate to plate. Count the openings separately, by size.
Note the wall height: a 9-foot wall uses longer studs and more sheathing than an 8-foot one. Exterior walls get sheathing and wrap; interior walls don't.
Then count the extras:
- blocking for cabinets and grab bars
- fire blocking
- backing at corners
Each line item carries your own hours
These are the common lines on a framing estimate and what each is measured in:
- By the linear foot: walls, plates, shoring and blocking.
- By the square foot: floor and ceiling framing, sheathing and wrap.
- By the each: openings, headers, trusses and stairs.
The hours and prices are yours to set, and every line's hours are editable to match your crew.
| Line item | Measured in |
|---|---|
| Interior non-bearing wall framing 2x4 at 16 in oc | Linear feet |
| Exterior bearing wall framing 2x6 at 16 in oc | Linear feet |
| Pressure-treated bottom plate anchored to slab | Linear feet |
| Door rough opening framing with header | Each |
| Window rough opening framing with sill and cripples | Each |
| Built-up LVL header assembly | Each |
| Floor joist framing 2x10 at 16 in oc | Square feet |
| Subfloor sheathing 3/4 in tongue and groove | Square feet |
| Exterior wall sheathing 7/16 in osb | Square feet |
| House wrap and seam taping over sheathing | Square feet |
| Ceiling joist framing 2x8 at 16 in oc | Square feet |
| Set and brace prefabricated roof truss | Each |
| Roof deck sheathing 1/2 in osb with clips | Square feet |
| Temporary shoring wall for bearing wall removal | Linear feet |
| In-wall backing blocking for fixtures and cabinets | Linear feet |
| Stair stringer layout and installation | Each |
Openings add almost as much as the wall
Example: Here's one exterior wall for a small addition: 40 feet of 2x6 bearing wall with 9-foot plates, three windows and one door, sheathed and wrapped. Most crews sheathe over the openings and cut them out, so the sheathing and wrap cover the whole 40 by 9 foot face, 360 square feet. The hours below are example figures; say your own records show your crew needs:
Work Your hours Exterior wall framing, 40 feet 20 Window rough openings, 3 6 Door rough opening, 1 1.5 OSB wall sheathing, 360 square feet 7.5 House wrap, 360 square feet 3 Total 38
The openings and the skin add almost as many hours as the plain wall. That's where a per-foot or per-square-foot price for framing goes wrong on a wall full of windows.
Your labor rate covers more than the wage
A framer's wage isn't your labor rate. Your rate has to cover:
- the wage
- payroll taxes, workers' comp premiums and liability coverage
- the saws, nailers, compressors and the truck
- fall protection and staging
- rain days and the time spent bidding
Then it needs a profit.
Wage, overhead, then markup
BuildWell turns the wage into your rate in three steps:
- Wage: the median carpenter wage for your metro.
- Overhead: your labor overhead, which begins at 100% and so doubles the wage.
- Markup: your labor markup, which begins at 20%.
Example: Say your framers cost you $30 an hour each. Use your real number. The 38 hours on that wall come to:
- Wages: 38 × $30 = $1,140
- With 100% overhead: $2,280
- With 20% markup: $2,736 for labor
The floor, the roof and the interior walls come on top.
Price lumber near the job; quote trusses
- Lumber and sheathing: price them near the job this week. On a big job, many framers also get a package quote from a lumberyard. Either way, add a markup for the culls, the extra sheets and the trips back. BuildWell starts material markup at 20%.
- Trusses and engineered lumber: get the supplier's quote and enter it. Trusses are made to order, so in BuildWell they're marked as needing a price until you do.
- Labor-only bids: when the builder supplies the package, mark the materials client-supplied. They stay on the estimate so the scope is clear, but aren't charged.
Size beams right and plan for inspections
- Bearing walls and beams: a beam or header that carries a load should be sized by an engineer, from the manufacturer's tables, or by your building department, not by eye. Price the shoring, the beam and the posts as separate lines.
- Permits and inspections: most structural work needs a permit, and new framing is usually inspected before it's covered. List the permit fee on the estimate; BuildWell adds your flat fee automatically when a permit is included.
- Older homes: opening walls in a house built before 1978 disturbs painted surfaces. Lead-safe work practices apply, and in BuildWell ticking a pre-1978 home adds a lead-safe setup and cleanup line.