Free flooring receipt template
A flooring receipt with 11 common line items already listed, each with its unit, and room for how the client paid and what’s still owed. Keep the lines the payment covers and send it.
Free, no sign-up. Amounts are left blank for the payment you received.

What’s on a flooring receipt
Every line is one part of the flooring job, listed on its own so the client can see exactly what their payment covered.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Carpet and pad tear-out and haul-off | per sq ft | Removal is priced by what’s coming up, not by what’s going down. |
| Ceramic tile floor demolition to subfloor | per sq ft | Breaking out tile takes far longer than pulling carpet, so it has its own rate. |
| Subfloor squeak repair and screw-down | per sq ft | Subfloor fixes happen before the new floor goes down and vary by house. |
| Self-leveling underlayment pour | per sq ft | Long planks and large tile need a flat floor. Leveling stays optional until you’ve checked it. |
| Luxury vinyl plank floating floor installation | per sq ft | Each flooring type goes down at a different pace, so each has its own per-square-foot line. |
| Engineered hardwood glue-down installation | per sq ft | Glue-down wood is slower than a floating floor and priced that way. |
| Porcelain floor tile installation in thinset | per sq ft | Tile is the slowest floor to set, and it’s priced by area like the rest. |
| Baseboard removal and reinstallation | per linear ft | Base comes off before the floor goes in and goes back after, measured around the room. |
| Shoe molding installation and caulk | per linear ft | Shoe molding covers the expansion gap at the walls and is priced by the foot. |
| Floor transition strip installation at doorway | per linear ft | Every doorway where floors meet needs a transition. Listing them avoids a missing detail. |
| Floor protection, final cleanup and debris removal | per sq ft | Protection and cleanup are priced by area and show the job is left clean. |
Your flooring receipt in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Name what it pays
Write the number of the invoice or quote the payment is for, and whether it’s a deposit, a progress payment or the final payment.
- 3
List what it covers
Keep the lines the payment covers, with the quantities in square feet and linear feet and the prices from the invoice, and delete the rest.
- 4
Record the payment
Fill in the date paid, how the client paid with the check number or reference, and any balance still owed. Save it as a PDF and send it.
How flooring jobs get paid
Flooring is often special-ordered, so the deposit usually pays for material. The receipt for it should name the product, color and quantity ordered, so the client has proof the order was placed for them, and both of you have the same record if the delivery arrives short or in the wrong color.
The final payment comes when the floor is down, the base and shoe are back on and the transitions are in. List the product installed, the square footage per room and the date, along with how the client paid and the check number or transfer reference. Manufacturers may ask for proof of professional installation and the install date when a warranty claim is made, and this receipt is that proof.
If the client is financing the floor, the lender may pay you directly once the client signs off, and may want a completion receipt first. Name the lender as payer on that receipt and give the client their own copy. Leftover boxes go on the receipt too, so the client knows the spares are theirs.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This receipt records the payment shown for the invoice or quote named above.
- Installation is warranted for ____ year(s); the flooring carries the manufacturer’s warranty.
- Any balance still owed is written under Payment details.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Flooring receipt template FAQ
01Is this flooring receipt template free?
02How do I show a deposit or a partial payment?
03Can BuildWell send receipts for me?
04What should a flooring receipt show for a manufacturer warranty?
05How do I write a receipt for a flooring material deposit?
06How do I handle a receipt when a lender pays for the floor?
Browse by format
- Receipt template for PDF
- Receipt template for Word
- Receipt template for Excel
- Make a receipt online
- Flooring estimate template
- Flooring invoice template
- Flooring quote template
- Flooring software
Guides for flooring receipts
Browse by trade
- Plumbing receipt template
- Roofing receipt template
- Bathroom remodeling receipt template
- Kitchen remodeling receipt template
- Electrical receipt template
- Painting receipt template
- Drywall receipt template
- Handyman receipt template
- Carpentry receipt template
- Concrete receipt template
- Deck and fence receipt template
- Siding receipt template
- Window and door receipt template

Price your next flooring job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.