Free flooring invoice template
A flooring invoice with 11 common line items already listed, each with its unit, and the terms flooring jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a flooring invoice
Every line is one part of the flooring job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Carpet and pad tear-out and haul-off | per sq ft | Removal is priced by what’s coming up, not by what’s going down. |
| Ceramic tile floor demolition to subfloor | per sq ft | Breaking out tile takes far longer than pulling carpet, so it has its own rate. |
| Subfloor squeak repair and screw-down | per sq ft | Subfloor fixes happen before the new floor goes down and vary by house. |
| Self-leveling underlayment pour | per sq ft | Long planks and large tile need a flat floor. Leveling stays optional until you’ve checked it. |
| Luxury vinyl plank floating floor installation | per sq ft | Each flooring type goes down at a different pace, so each has its own per-square-foot line. |
| Engineered hardwood glue-down installation | per sq ft | Glue-down wood is slower than a floating floor and priced that way. |
| Porcelain floor tile installation in thinset | per sq ft | Tile is the slowest floor to set, and it’s priced by area like the rest. |
| Baseboard removal and reinstallation | per linear ft | Base comes off before the floor goes in and goes back after, measured around the room. |
| Shoe molding installation and caulk | per linear ft | Shoe molding covers the expansion gap at the walls and is priced by the foot. |
| Floor transition strip installation at doorway | per linear ft | Every doorway where floors meet needs a transition. Listing them avoids a missing detail. |
| Floor protection, final cleanup and debris removal | per sq ft | Protection and cleanup are priced by area and show the job is left clean. |
Your flooring invoice in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Copy the signed estimate
Use the same lines and prices the client approved, then add each approved change as its own line.
- 3
Bill what was done
Enter the quantities actually installed, in square feet and linear feet, and record any deposit already received under Amount paid.
- 4
Send it
Add the invoice date, a due date and how to pay, save it as a PDF and send it.
How flooring jobs are billed
Flooring jobs commonly take a deposit at signing to order material, since flooring is often special-ordered and some types need to sit in the house to acclimate before they go down, and the balance on completion.
If the subfloor needed more leveling or repair than estimated, bill the extra square feet as their own line at the rate on your estimate. Note on the invoice that leftover boxes stay with the client, who paid for them and may need them for repairs.
If the client staged the job, the bedrooms one week and the living area the next, bill per area as each is finished. List the product installed, its square footage and the transitions, so the client has a record for warranty claims and future repairs. Furniture moving, if it was an extra, goes on its own line.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- Payment is due on completion.
- Leftover flooring material stays with the client.
- Please include the invoice number with your payment.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Flooring invoice template FAQ
01Is this flooring invoice template free?
02Can I bill a deposit with this template?
03Can clients pay the invoice online?
04How much waste should I add?
05Should removal be its own line?
06What if I find problems under the old floor?
Browse by format
- Invoice template for PDF
- Invoice template for Word
- Invoice template for Excel
- Invoice template for Google Docs
- Invoice template for Google Sheets
- Make an invoice online
- Flooring estimate template
- Flooring quote template
- Flooring receipt template
- Flooring software
Guides for flooring invoices
Browse by trade
- Plumbing invoice template
- Roofing invoice template
- Bathroom remodeling invoice template
- Kitchen remodeling invoice template
- Electrical invoice template
- Painting invoice template
- Drywall invoice template
- Handyman invoice template
- Carpentry invoice template
- Concrete invoice template
- Deck and fence invoice template
- Siding invoice template
- Window and door invoice template

Price your next flooring job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.