Free kitchen remodeling invoice template
A kitchen remodeling invoice with 11 common line items already listed, each with its unit, and the terms kitchen remodeling jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a kitchen remodeling invoice
Every line is one part of the kitchen remodeling job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Kitchen cabinet demolition and removal | per linear ft | Old cabinets come out by the foot of run, before anything new goes in. |
| Kitchen sink drain and supply rough-in | each | A new or moved sink needs rough plumbing before the base cabinets are set. |
| Kitchen small appliance branch circuit rough-in | each | Countertops need their own circuits under most codes, and each is electrician time. |
| Base cabinet set and install | per linear ft | Base cabinets are set by the foot of run and level the whole kitchen. |
| Wall cabinet hang and install | per linear ft | Hanging uppers takes longer per foot than setting bases, so it’s a separate line. |
| Laminate countertop install | per linear ft | Countertops follow the base run. A different top changes this line, not the estimate. |
| Ceramic tile backsplash install | per sq ft | Backsplash is priced by area between the counter and the wall cabinets. |
| Under-cabinet LED lighting install | per linear ft | An add-on many clients want. Its own line lets them decide. |
| Kitchen sink and faucet install | each | Setting the sink and faucet is per fixture, whoever buys them. |
| Luxury vinyl plank flooring install | per sq ft | Flooring is often a separate decision and is priced by area. |
| Dumpster rental and haul-away | each | A dumpster is a fixed cost per job that clients don’t see unless it’s listed. |
Your kitchen remodeling invoice in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Copy the signed estimate
Use the same lines and prices the client approved, then add each approved change as its own line.
- 3
Bill what was done
Enter the quantities actually installed, in linear feet, each and square feet, and record any deposit already received under Amount paid.
- 4
Send it
Add the invoice date, a due date and how to pay, save it as a PDF and send it.
How kitchen remodeling jobs are billed
Kitchen remodels are billed on a schedule tied to milestones: a deposit at signing, often a payment when the cabinets are ordered since they’re a large up-front cost, a progress payment after rough-in, and the balance after counters, backsplash and the punch list.
Cabinets and countertops are where changes pile up: an extra drawer base, a different edge, a moved sink. Bill each approved change as its own line so the final invoice matches the signed estimate plus the signed changes, with nothing to argue about.
Keep track of what the client bought themselves. Where they supplied appliances or fixtures, the invoice shows installation only for those lines, and a trip to return or exchange a wrong item they ordered can be billed as its own line at the rate you agreed. Where an inspection was required, note it before the balance.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- Payment is due within ____ days of the invoice date.
- Approved changes are billed as listed on the signed change orders.
- Please include the invoice number with your payment.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Kitchen remodeling invoice template FAQ
01Is this kitchen remodeling invoice template free?
02Can I bill a deposit with this template?
03Can clients pay the invoice online?
04Why are cabinets priced per linear foot?
05Should appliances be on a kitchen estimate?
06How do I price countertops before they’re measured?
Browse by format
- Invoice template for PDF
- Invoice template for Word
- Invoice template for Excel
- Invoice template for Google Docs
- Invoice template for Google Sheets
- Make an invoice online
- Kitchen remodeling estimate template
- Kitchen remodeling quote template
- Kitchen remodeling receipt template
- Kitchen remodeling software
Guides for kitchen remodeling invoices
Browse by trade
- Plumbing invoice template
- Roofing invoice template
- Bathroom remodeling invoice template
- Electrical invoice template
- Painting invoice template
- Drywall invoice template
- Flooring invoice template
- Handyman invoice template
- Carpentry invoice template
- Concrete invoice template
- Deck and fence invoice template
- Siding invoice template
- Window and door invoice template

Price your next kitchen remodeling job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.