Free handyman invoice template
A handyman invoice with 11 common line items already listed, each with its unit, and the terms handyman jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a handyman invoice
Every line is one part of the handyman job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Patch small drywall hole and sand | each | A flat price per patch is easier to approve than an hourly guess. |
| Re-caulk tub and shower perimeter joint | per linear ft | Old caulk has to come out before new goes in; priced by the foot of joint. |
| Pull and reset toilet with new wax ring | each | A common fix with a known time. A flat line makes it easy to say yes to. |
| Replace leaking lavatory faucet | each | Priced per faucet. If the client bought the faucet, it’s labor only. |
| Replace interior door knob set | each | Hardware swaps are quick, counted tasks that clients often add to a list. |
| Adjust and rehang sagging interior door | each | Door adjustments are separate from replacing the door, and much cheaper. |
| Replace damaged baseboard run | per linear ft | Baseboard is measured by the foot, so the price follows the damage. |
| Prime and repaint patched wall area | per sq ft | Patches need paint to disappear. A separate line makes clear whether that’s included. |
| Replace cracked floor tile | each | Each tile is careful removal and resetting, priced each. |
| Install blocked-in bathroom grab bar | each | A grab bar needs solid blocking behind it to be safe. The line covers both. |
| Reseal gutter joints and clear debris | per linear ft | Outside work priced by the foot of gutter, often added to an inside list. |
Your handyman invoice in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Copy the signed estimate
Use the same lines and prices the client approved, then add each approved change as its own line.
- 3
Bill what was done
Enter the quantities actually installed, in each, linear feet and square feet, and record any deposit already received under Amount paid.
- 4
Send it
Add the invoice date, a due date and how to pay, save it as a PDF and send it.
How handyman jobs are billed
Handyman jobs are usually one visit, so the invoice goes out when the work is done and is due on receipt. List each completed task as its own line, including the ones added on site, so the client sees exactly what they’re paying for.
For a long list spread over several visits, bill each visit separately or take a deposit for materials up front. Show the trip or minimum charge as its own line when it applies.
Keep receipts for the parts you bought and list the parts as their own lines, at cost or with the markup your estimate stated. Clients compare parts on an invoice with store prices, and listing them openly heads off questions. For repeat clients, a short note of what’s still on their list helps you book the next visit.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- Payment is due on receipt.
- Please include the invoice number with your payment.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Handyman invoice template FAQ
01Is this handyman invoice template free?
02Can I bill a deposit with this template?
03Can clients pay the invoice online?
04Hourly or flat rate: which is better for handyman work?
05Can a handyman do electrical or plumbing work?
06Should I charge a trip fee?
Browse by format
- Invoice template for PDF
- Invoice template for Word
- Invoice template for Excel
- Invoice template for Google Docs
- Invoice template for Google Sheets
- Make an invoice online
- Handyman estimate template
- Handyman quote template
- Handyman receipt template
- Handyman software
Guides for handyman invoices
Browse by trade
- Plumbing invoice template
- Roofing invoice template
- Bathroom remodeling invoice template
- Kitchen remodeling invoice template
- Electrical invoice template
- Painting invoice template
- Drywall invoice template
- Flooring invoice template
- Carpentry invoice template
- Concrete invoice template
- Deck and fence invoice template
- Siding invoice template
- Window and door invoice template

Price your next handyman job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.