Free concrete invoice template
A concrete invoice with 10 common line items already listed, each with its unit, and the terms concrete jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a concrete invoice
Every line is one part of the concrete job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Saw-cut and demolish existing concrete slab | per sq ft | Breaking out old concrete is heavy work with its own disposal cost, priced by area. |
| Concrete debris haul-out and jobsite cleanup | per sq ft | Broken concrete is heavy to haul. Listing it explains a cost clients don’t expect. |
| Excavate and grade subgrade for flatwork | per sq ft | Grading depends on the site, not on the slab, so it’s priced on its own. |
| Compacted gravel base course | per sq ft | The base under the slab is hidden once it’s poured. A line shows it’s there. |
| Slab edge formwork with 2x4 lumber | per linear ft | Forms are measured around the edge in linear feet. |
| Rebar grid reinforcement for slab | per sq ft | Reinforcement is a choice the client can see on paper but not once it’s poured. |
| Place and screed 4 in concrete slab | per sq ft | Placing concrete is priced by area at a set thickness; a thicker slab is a different price. |
| Broom finish and cure concrete flatwork | per sq ft | The finish is its own step, and decorative finishes cost more than broom. |
| Saw-cut control joints in slab | per linear ft | Control joints guide where the slab cracks, measured by the foot. |
| Apply penetrating concrete sealer | per sq ft | Sealing is optional and often done later. Its own line keeps it a choice. |
Your concrete invoice in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Copy the signed estimate
Use the same lines and prices the client approved, then add each approved change as its own line.
- 3
Bill what was done
Enter the quantities actually installed, in square feet and linear feet, and record any deposit already received under Amount paid.
- 4
Send it
Add the invoice date, a due date and how to pay, save it as a PDF and send it.
How concrete jobs are billed
Concrete jobs commonly take a deposit at signing and the balance when the pour is finished, since the ready-mix order and the crew are committed on pour day. Larger jobs with demolition or footings may add a progress payment after the forms and reinforcement pass inspection.
If the slab was poured larger or thicker than estimated, or the base needed more gravel, bill the difference as its own line. Put the cure-time instructions on the invoice: when the client can walk on it and when they can drive on it.
Weather delays don’t usually change the price, but a rained-out pour can cost you a trip. Bill a rescheduling fee only if it was in your terms. Pumping, when the truck can’t reach the forms, is usually a separate charge; show it as its own line so it matches the estimate.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- The balance is due when the pour is complete.
- Keep vehicles off the new concrete for ____ days.
- Please include the invoice number with your payment.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Concrete invoice template FAQ
01Is this concrete invoice template free?
02Can I bill a deposit with this template?
03Can clients pay the invoice online?
04Should concrete be priced per square foot or per cubic yard?
05Why are demolition and the base separate lines?
06Do I need to list the reinforcement?
Browse by format
- Invoice template for PDF
- Invoice template for Word
- Invoice template for Excel
- Invoice template for Google Docs
- Invoice template for Google Sheets
- Make an invoice online
- Concrete estimate template
- Concrete quote template
- Concrete receipt template
- Concrete software
Guides for concrete invoices
Browse by trade
- Plumbing invoice template
- Roofing invoice template
- Bathroom remodeling invoice template
- Kitchen remodeling invoice template
- Electrical invoice template
- Painting invoice template
- Drywall invoice template
- Flooring invoice template
- Handyman invoice template
- Carpentry invoice template
- Deck and fence invoice template
- Siding invoice template
- Window and door invoice template

Price your next concrete job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.