Free roofing invoice template
A roofing invoice with 11 common line items already listed, each with its unit, and the terms roofing jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a roofing invoice
Every line is one part of the roofing job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Asphalt shingle roof tear-off and disposal | per sq ft | Tear-off depends on the layers coming off and the dump fees, not on the new roof, so it’s priced on its own. |
| Roof sheathing replacement over rafters | per sq ft | Rotten decking only shows after tear-off. A per-square-foot line lets you state an allowance and the price beyond it. |
| Install synthetic roof underlayment | per sq ft | Underlayment covers the whole deck and is priced by area, separately from the shingles over it. |
| Install ice and water shield at eaves and valleys | per linear ft | Measured along the eaves and valleys, and required by code in many cold-climate areas. |
| Install aluminum drip edge | per linear ft | Edge metal runs around the eaves and rakes and is priced by the foot. |
| Install architectural asphalt shingles | per sq ft | The field shingles are the biggest line, priced by area including pitch and waste. |
| Install hip and ridge cap shingles | per linear ft | Cap shingles are counted by the foot of hip and ridge, not by area. |
| Install shingle-over ridge vent | per linear ft | Ventilation is its own choice. Listing it shows the client what keeps the attic dry. |
| Install pipe boot flashing at vent stack | each | Flashings are priced each, so the number of pipes on the roof shows in the price. |
| Reflash chimney with step and counterflashing | each | Chimney flashing is slow, detailed work at a common leak point, so it gets its own line. |
| Final cleanup and magnetic nail sweep | each | Homeowners worry about nails in the driveway. Naming the sweep shows it’s included. |
Your roofing invoice in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Copy the signed estimate
Use the same lines and prices the client approved, then add each approved change as its own line.
- 3
Bill what was done
Enter the quantities actually installed, in square feet, linear feet and each, and record any deposit already received under Amount paid.
- 4
Send it
Add the invoice date, a due date and how to pay, save it as a PDF and send it.
How roofing jobs are billed
A reroof is usually billed in two parts: a deposit at signing so you can order shingles and book the dumpster, and the balance when the roof is on and the site is clean. Repairs and leak calls are a single invoice due on completion.
The line that changes between the estimate and the invoice is decking. If tear-off found more rotten sheathing than the allowance, bill the extra square feet as their own line at the overage price from the estimate, so the homeowner can match it to what they signed. Keep the workmanship warranty on the final invoice.
Homeowners paying through an insurance claim or financing usually need an itemized final invoice. Keep the lines in the same order and units as the estimate, list the square feet installed, and note the shingle line and color used, so the client can pass the invoice on without asking you to rewrite it.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- Payment is due on completion of the roof.
- Sheathing beyond the allowance is billed at the per-square-foot price on the estimate.
- Workmanship warranty: ____ years from completion. Shingles carry the manufacturer’s warranty.
- Please include the invoice number with your payment.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Roofing invoice template FAQ
01Is this roofing invoice template free?
02Can I bill a deposit with this template?
03Can clients pay the invoice online?
04Why is the template in square feet instead of squares?
05How do I handle rotten decking on an estimate?
06Should gutters go on a roofing estimate?
Browse by format
- Invoice template for PDF
- Invoice template for Word
- Invoice template for Excel
- Invoice template for Google Docs
- Invoice template for Google Sheets
- Make an invoice online
- Roofing estimate template
- Roofing quote template
- Roofing receipt template
- Roofing software
Guides for roofing invoices
Browse by trade
- Plumbing invoice template
- Bathroom remodeling invoice template
- Kitchen remodeling invoice template
- Electrical invoice template
- Painting invoice template
- Drywall invoice template
- Flooring invoice template
- Handyman invoice template
- Carpentry invoice template
- Concrete invoice template
- Deck and fence invoice template
- Siding invoice template
- Window and door invoice template

Price your next roofing job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.