Free roofing estimate template
A roofing estimate with 11 common line items already listed, each with its unit, and the terms roofing jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a roofing estimate
Every line is one part of the roofing job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Asphalt shingle roof tear-off and disposal | per sq ft | Tear-off depends on the layers coming off and the dump fees, not on the new roof, so it’s priced on its own. |
| Roof sheathing replacement over rafters | per sq ft | Rotten decking only shows after tear-off. A per-square-foot line lets you state an allowance and the price beyond it. |
| Install synthetic roof underlayment | per sq ft | Underlayment covers the whole deck and is priced by area, separately from the shingles over it. |
| Install ice and water shield at eaves and valleys | per linear ft | Measured along the eaves and valleys, and required by code in many cold-climate areas. |
| Install aluminum drip edge | per linear ft | Edge metal runs around the eaves and rakes and is priced by the foot. |
| Install architectural asphalt shingles | per sq ft | The field shingles are the biggest line, priced by area including pitch and waste. |
| Install hip and ridge cap shingles | per linear ft | Cap shingles are counted by the foot of hip and ridge, not by area. |
| Install shingle-over ridge vent | per linear ft | Ventilation is its own choice. Listing it shows the client what keeps the attic dry. |
| Install pipe boot flashing at vent stack | each | Flashings are priced each, so the number of pipes on the roof shows in the price. |
| Reflash chimney with step and counterflashing | each | Chimney flashing is slow, detailed work at a common leak point, so it gets its own line. |
| Final cleanup and magnetic nail sweep | each | Homeowners worry about nails in the driveway. Naming the sweep shows it’s included. |
Your roofing estimate in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Measure the job
Measure the roof surface in square feet (a square is 100 sq ft), allowing for pitch and waste, then measure eaves, rakes, ridges and valleys in linear feet and count pipes, vents and chimneys.
- 3
Price each line
Enter a quantity and your unit price on each line the job needs, in square feet, linear feet and each. Delete the lines you don’t need and add any that are missing.
- 4
Send it for a signature
Read the terms, fill in the blanks, save it as a PDF and send it. The client signs the acceptance line before you start.
How roofing jobs are priced
Roofers price by the square: 100 square feet of roof surface. The surface comes from the roof’s footprint adjusted for pitch, since a steeper roof has more area than the house under it, plus a waste allowance for cuts at hips and valleys. Tear-off, underlayment and shingles all follow that area, so the template lists them per square foot; multiply your squares by 100 to fill them in.
Everything along an edge is linear: drip edge, ice and water shield at the eaves, ridge cap and ridge vent. Everything that’s counted is priced each: pipe boots, vents, chimneys and skylights. Splitting the roof this way lets a homeowner compare bids line by line instead of total against total.
The one line you can’t measure from the ground is decking. Price sheathing replacement as an allowance, a number of square feet included, with a price per square foot beyond it, and put both in the terms before tear-off day.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This estimate is valid for 30 days.
- Includes up to ____ sq ft of sheathing replacement; more is billed at $____ per sq ft.
- Price is based on ____ layer(s) of existing roofing. Additional layers are priced as a change.
- A deposit is due at signing; the balance is due on completion.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Roofing estimate template FAQ
01Is this roofing estimate template free?
02Why are the prices blank?
03Can BuildWell price the estimate for me?
04Why is the template in square feet instead of squares?
05How do I handle rotten decking on an estimate?
06Should gutters go on a roofing estimate?
Browse by format
- Estimate template for PDF
- Estimate template for Word
- Estimate template for Excel
- Estimate template for Google Docs
- Estimate template for Google Sheets
- Make an estimate online
- Roofing invoice template
- Roofing quote template
- Roofing receipt template
- Roofing software
Guides for roofing estimates
Browse by trade
- Plumbing estimate template
- Bathroom remodeling estimate template
- Kitchen remodeling estimate template
- Electrical estimate template
- Painting estimate template
- Drywall estimate template
- Flooring estimate template
- Handyman estimate template
- Carpentry estimate template
- Concrete estimate template
- Deck and fence estimate template
- Siding estimate template
- Window and door estimate template

Price your next roofing job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.