Free flooring estimate template
A flooring estimate with 11 common line items already listed, each with its unit, and the terms flooring jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a flooring estimate
Every line is one part of the flooring job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Carpet and pad tear-out and haul-off | per sq ft | Removal is priced by what’s coming up, not by what’s going down. |
| Ceramic tile floor demolition to subfloor | per sq ft | Breaking out tile takes far longer than pulling carpet, so it has its own rate. |
| Subfloor squeak repair and screw-down | per sq ft | Subfloor fixes happen before the new floor goes down and vary by house. |
| Self-leveling underlayment pour | per sq ft | Long planks and large tile need a flat floor. Leveling stays optional until you’ve checked it. |
| Luxury vinyl plank floating floor installation | per sq ft | Each flooring type goes down at a different pace, so each has its own per-square-foot line. |
| Engineered hardwood glue-down installation | per sq ft | Glue-down wood is slower than a floating floor and priced that way. |
| Porcelain floor tile installation in thinset | per sq ft | Tile is the slowest floor to set, and it’s priced by area like the rest. |
| Baseboard removal and reinstallation | per linear ft | Base comes off before the floor goes in and goes back after, measured around the room. |
| Shoe molding installation and caulk | per linear ft | Shoe molding covers the expansion gap at the walls and is priced by the foot. |
| Floor transition strip installation at doorway | per linear ft | Every doorway where floors meet needs a transition. Listing them avoids a missing detail. |
| Floor protection, final cleanup and debris removal | per sq ft | Protection and cleanup are priced by area and show the job is left clean. |
Your flooring estimate in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Measure the job
Measure each room’s floor in square feet, add your waste factor for the material and layout, and measure the perimeter in linear feet for base, shoe and transitions.
- 3
Price each line
Enter a quantity and your unit price on each line the job needs, in square feet and linear feet. Delete the lines you don’t need and add any that are missing.
- 4
Send it for a signature
Read the terms, fill in the blanks, save it as a PDF and send it. The client signs the acceptance line before you start.
How flooring jobs are priced
Flooring is priced by the square foot, and nearly every flooring estimate has three parts: getting the old floor out, getting the subfloor ready, and putting the new floor down. Each has its own rate, and each depends on the material. Pulling carpet is quick and breaking out tile is not; a floating vinyl plank floor goes down faster than glued engineered wood or tile set in thinset.
Measure the room, then add a waste factor for cuts: more for diagonal or herringbone layouts and large tile than for straight plank. Prep is where flooring jobs go over. A floor that isn’t flat enough for long planks or large tile needs leveling, and you won’t know until the old floor is up, so keep leveling and subfloor repair on their own per-square-foot lines that can change without redoing the estimate.
The perimeter is linear: baseboard removal and reinstallation, shoe molding, and a transition at each doorway. The other common question is furniture and appliances; say in the terms whether moving them is included.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This estimate is valid for 30 days.
- Quantities include ____% waste. Material is ordered once the deposit is received.
- Subfloor leveling and repair beyond what’s listed is priced as a change once the old floor is removed.
- Moving furniture and appliances is ____ (included / excluded).
- A deposit is due at signing; the balance is due on completion.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Flooring estimate template FAQ
01Is this flooring estimate template free?
02Why are the prices blank?
03Can BuildWell price the estimate for me?
04How much waste should I add?
05Should removal be its own line?
06What if I find problems under the old floor?
Browse by format
- Estimate template for PDF
- Estimate template for Word
- Estimate template for Excel
- Estimate template for Google Docs
- Estimate template for Google Sheets
- Make an estimate online
- Flooring invoice template
- Flooring quote template
- Flooring receipt template
- Flooring software
Guides for flooring estimates
Browse by trade
- Plumbing estimate template
- Roofing estimate template
- Bathroom remodeling estimate template
- Kitchen remodeling estimate template
- Electrical estimate template
- Painting estimate template
- Drywall estimate template
- Handyman estimate template
- Carpentry estimate template
- Concrete estimate template
- Deck and fence estimate template
- Siding estimate template
- Window and door estimate template

Price your next flooring job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.