Free window and door estimate template
A window and door estimate with 11 common line items already listed, each with its unit, and the terms window and door jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a window and door estimate
Every line is one part of the window and door job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Existing window removal and disposal | each | Removing the old unit is priced per opening and depends on how it was installed. |
| Exterior door removal and disposal | each | Old exterior doors come out with their frames, priced each. |
| Window rough opening framing | each | Changing an opening’s size means framing work, priced per opening. |
| Insert replacement window installation | each | Insert windows fit the existing frame and go in faster than full-frame windows. |
| New construction window installation | each | A full-frame window goes to the rough opening and is flashed in, so it’s priced differently from an insert. |
| Exterior prehung entry door installation | each | Entry doors are priced each, including the threshold, shimming and adjustment. |
| Sliding patio door installation | each | Patio doors are large, heavy units with their own price per door. |
| Rough opening air sealing and foam insulation | each | Sealing the gap around each unit is easy to skip and matters for drafts. A line shows it’s done. |
| Window stool and apron trim installation | each | Interior window trim is priced per window, separately from the install. |
| Door casing installation | per linear ft | Casing is measured around each opening in linear feet. |
| Exterior door and window perimeter caulking | per linear ft | Outside caulking is the last seal against water, priced by the foot. |
Your window and door estimate in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Measure the job
Count every window and door by type and size, note the openings that change size or need framing, and measure casing in linear feet.
- 3
Price each line
Enter a quantity and your unit price on each line the job needs, in each and linear feet. Delete the lines you don’t need and add any that are missing.
- 4
Send it for a signature
Read the terms, fill in the blanks, save it as a PDF and send it. The client signs the acceptance line before you start.
How window and door jobs are priced
Windows and doors are priced by the unit. Each opening gets a price to remove the old unit, install the new one and finish it inside and out, and the type of install sets the price. An insert replacement window fits into the existing frame and goes in quickly. A full-frame or new construction window means removing the frame down to the rough opening, which costs more but lets you repair rot and flash the opening properly.
Doors follow the same logic: a slab on an existing jamb is quick, a prehung unit is more, and an entry or patio door with new framing, threshold and hardware is more again. When an opening changes size, framing and a header are their own lines.
Interior trim, exterior trim and caulking are where window bids differ most. List them per opening or per linear foot so the client sees what will be finished and what’s left for the painter. Units are usually ordered to size and can take weeks to arrive, so put the ordering and lead-time terms in writing.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This estimate is valid for 30 days.
- Windows and doors are ordered to size once the deposit is received and can’t be returned.
- Rot or framing damage found when units are removed is priced as a change.
- Interior painting is excluded unless listed.
- A deposit is due at signing; the balance is due on completion.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Window and door estimate template FAQ
01Is this window and door estimate template free?
02Why are the prices blank?
03Can BuildWell price the estimate for me?
04Should I price windows per unit or by size?
05What’s the difference between an insert and a new construction install?
06Should trim and caulking be separate lines?
Browse by format
- Estimate template for PDF
- Estimate template for Word
- Estimate template for Excel
- Estimate template for Google Docs
- Estimate template for Google Sheets
- Make an estimate online
- Window and door invoice template
- Window and door quote template
- Window and door receipt template
- Window and door software
Guides for window and door estimates
Browse by trade
- Plumbing estimate template
- Roofing estimate template
- Bathroom remodeling estimate template
- Kitchen remodeling estimate template
- Electrical estimate template
- Painting estimate template
- Drywall estimate template
- Flooring estimate template
- Handyman estimate template
- Carpentry estimate template
- Concrete estimate template
- Deck and fence estimate template
- Siding estimate template

Price your next window and door job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.