Free deck and fence estimate template
A deck and fence estimate with 11 common line items already listed, each with its unit, and the terms deck and fence jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a deck and fence estimate
Every line is one part of the deck and fence job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Existing deck demolition and tear-out | per sq ft | Tearing out an old deck is priced by area and includes hauling it away. |
| Old fence and post removal | per linear ft | Old fence comes out by the foot, posts and all, before the new line goes in. |
| Concrete footing excavation and pier pour | each | Footings are counted: each is a hole, a form and concrete. |
| Ledger board attachment with flashing | per linear ft | The ledger ties the deck to the house and must be flashed against water, so it gets its own line. |
| Deck joist framing at 16 in on center | per sq ft | Framing is priced per square foot of deck at a set joist spacing. |
| Pressure-treated deck board installation | per sq ft | Decking is priced by area, and wood and composite are very different prices. |
| Wood deck railing with balusters | per linear ft | Railing is measured along the open edges in linear feet. |
| Deck stair stringer framing | each | Stairs are priced by the flight; each is its own piece of framing. |
| Pressure-treated fence post setting in concrete | each | Fence posts are counted and set in concrete, separately from the fence between them. |
| Wood privacy fence rail and picket infill | per linear ft | The fence itself is priced by the linear foot along the line. |
| Fence gate fabrication and hanging | each | Gates are priced each: framing, hardware and hanging. |
Your deck and fence estimate in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Measure the job
Measure the deck surface in square feet, and fences, railings and the ledger in linear feet. Count footings, posts, gates and stairs.
- 3
Price each line
Enter a quantity and your unit price on each line the job needs, in square feet, linear feet and each. Delete the lines you don’t need and add any that are missing.
- 4
Send it for a signature
Read the terms, fill in the blanks, save it as a PDF and send it. The client signs the acceptance line before you start.
How deck and fence jobs are priced
Decks are quoted by the square foot of deck, but the footings, framing and railing drive the number as much as the boards do. Footings are counted, framing is priced per square foot at a set joist spacing, and decking is per square foot at very different prices for pressure-treated wood and composite. Railing and the ledger are linear, and stairs are priced by the flight.
Fences are priced by the linear foot of fence line, with posts and gates counted separately. Height, post spacing and the material between posts set the price per foot, and the ground matters: rocky soil and slopes take longer to set posts in.
Both trades dig, so put in the terms that the client confirms the property line, that utilities are marked before digging, and whether permits are included. A deck attached to the house usually needs a permit and an inspection of its footings and ledger.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This estimate is valid for 30 days.
- The client confirms the property lines. Underground utilities are marked before digging.
- Rock, roots or buried debris found while digging are priced as a change.
- Permits are ____ (included / not included).
- A deposit is due at signing; the balance is due on completion.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Deck and fence estimate template FAQ
01Is this deck and fence estimate template free?
02Why are the prices blank?
03Can BuildWell price the estimate for me?
04Should I price a deck per square foot or by the part?
05How do I price a fence with gates?
06Who’s responsible for the property line?
Browse by format
- Estimate template for PDF
- Estimate template for Word
- Estimate template for Excel
- Estimate template for Google Docs
- Estimate template for Google Sheets
- Make an estimate online
- Deck and fence invoice template
- Deck and fence quote template
- Deck and fence receipt template
- Deck and fence software
Guides for deck and fence estimates
Browse by trade
- Plumbing estimate template
- Roofing estimate template
- Bathroom remodeling estimate template
- Kitchen remodeling estimate template
- Electrical estimate template
- Painting estimate template
- Drywall estimate template
- Flooring estimate template
- Handyman estimate template
- Carpentry estimate template
- Concrete estimate template
- Siding estimate template
- Window and door estimate template

Price your next deck and fence job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.