Free painting invoice template
A painting invoice with 11 common line items already listed, each with its unit, and the terms painting jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a painting invoice
Every line is one part of the painting job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Move and cover furniture per room | each | Moving and covering furniture takes time per room, however big the walls are. |
| Patch nail holes and small dents | each | Prep varies more than painting does. Its own lines let you price the walls you actually found. |
| Repair drywall crack with tape and compound | per linear ft | Cracks are measured by the foot and need taping, not just paint. |
| Caulk trim and casing joints | per linear ft | Caulked joints are what make paint look finished, and they take time along every foot of trim. |
| Prime walls one coat with roller | per sq ft | Primer is needed on repairs, new drywall and big color changes, not on every wall, so it’s optional per room. |
| Brush and roll walls two coats | per sq ft | Walls are the core of the job, priced by area for two coats. |
| Brush and roll ceiling two coats | per sq ft | Ceilings are slower than walls, so they carry their own rate. |
| Paint baseboard two coats in place | per linear ft | Trim is linear and slower per foot than walls. A separate line lets clients choose walls only. |
| Paint door slab both sides two coats | each | Doors are counted, not measured. |
| Prime and paint cabinet door with enamel | each | Cabinet doors are detailed enamel work, priced per door and very different from walls. |
| Remove masking and detail touch-up per room | each | The final detail pass is per room and is what the client inspects at the walkthrough. |
Your painting invoice in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Copy the signed estimate
Use the same lines and prices the client approved, then add each approved change as its own line.
- 3
Bill what was done
Enter the quantities actually installed, in each, linear feet and square feet, and record any deposit already received under Amount paid.
- 4
Send it
Add the invoice date, a due date and how to pay, save it as a PDF and send it.
How painting jobs are billed
Most residential painting jobs are short enough to bill a deposit at signing, often to cover paint, and the balance on completion after a walkthrough with the client. Large interiors done in phases can be billed per floor or per completed area.
Bill touch-ups and color changes requested after the walkthrough as their own lines. If the client added a room or an accent wall during the job, list it separately so the invoice matches the signed estimate plus the approved changes.
List the paint colors and sheens used, room by room if they differ. It’s the record the client looks for when they need touch-up paint later, and it saves you a phone call. If leftover paint stays with the client, say so, and label the cans before you leave.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- Payment is due on completion, after the final walkthrough.
- Touch-ups requested within ____ days of completion are included.
- Please include the invoice number with your payment.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Painting invoice template FAQ
01Is this painting invoice template free?
02Can I bill a deposit with this template?
03Can clients pay the invoice online?
04Should I price painting by the room or by the square foot?
05Do I include the paint in the price?
06How do I account for prep work?
Browse by format
- Invoice template for PDF
- Invoice template for Word
- Invoice template for Excel
- Invoice template for Google Docs
- Invoice template for Google Sheets
- Make an invoice online
- Painting estimate template
- Painting quote template
- Painting receipt template
- Painting software
Guides for painting invoices
Browse by trade
- Plumbing invoice template
- Roofing invoice template
- Bathroom remodeling invoice template
- Kitchen remodeling invoice template
- Electrical invoice template
- Drywall invoice template
- Flooring invoice template
- Handyman invoice template
- Carpentry invoice template
- Concrete invoice template
- Deck and fence invoice template
- Siding invoice template
- Window and door invoice template

Price your next painting job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.