Free painting quote template
A fixed-price painting quote with 11 common line items already listed, each with its unit, and terms that say what the price covers. Add your quantities and prices, and send it to be signed.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a painting quote
Every line is one part of the painting job, priced on its own so the client can see exactly what the fixed price covers.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Move and cover furniture per room | each | Moving and covering furniture takes time per room, however big the walls are. |
| Patch nail holes and small dents | each | Prep varies more than painting does. Its own lines let you price the walls you actually found. |
| Repair drywall crack with tape and compound | per linear ft | Cracks are measured by the foot and need taping, not just paint. |
| Caulk trim and casing joints | per linear ft | Caulked joints are what make paint look finished, and they take time along every foot of trim. |
| Prime walls one coat with roller | per sq ft | Primer is needed on repairs, new drywall and big color changes, not on every wall, so it’s optional per room. |
| Brush and roll walls two coats | per sq ft | Walls are the core of the job, priced by area for two coats. |
| Brush and roll ceiling two coats | per sq ft | Ceilings are slower than walls, so they carry their own rate. |
| Paint baseboard two coats in place | per linear ft | Trim is linear and slower per foot than walls. A separate line lets clients choose walls only. |
| Paint door slab both sides two coats | each | Doors are counted, not measured. |
| Prime and paint cabinet door with enamel | each | Cabinet doors are detailed enamel work, priced per door and very different from walls. |
| Remove masking and detail touch-up per room | each | The final detail pass is per room and is what the client inspects at the walkthrough. |
Your painting quote in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Measure the job
Measure wall and ceiling areas in square feet room by room, trim in linear feet, and count doors, windows and cabinet doors.
- 3
Fix a price for each line
Enter a quantity and a fixed price on each line the job needs, in each, linear feet and square feet. Delete the lines you don’t need, and write what the price assumes in the terms.
- 4
Send it for acceptance
Fill in the blanks in the terms, save it as a PDF and send it. The client signs the acceptance line, and the price holds for the work listed.
How painting jobs are quoted
A painting quote works well on rooms you’ve walked and measured: a bedroom repaint in a similar color, a hallway with its trim and doors, a set of kitchen cabinet doors. The client sees one number for the room or the house and decides once, instead of watching hours add up. You carry the risk of the prep taking longer than it looked.
That risk lives in the walls. Before you fix a price, look at them under good light and decide how many nail holes, dents and cracks the patch and crack-repair lines really cover. Write down what the price assumes: walls sound, old paint bonded, no stains bleeding through. Water marks, smoke damage and peeling paint need scraping or a stain-blocking primer that the standard prime line doesn’t cover, so put them outside the price or quote them as their own lines.
Name the colors and sheens on the quote, or set an allowance of ____ colors per room, since each extra color adds cutting in and cleanup. Cabinet doors deserve their own quote with their own count, because enamel work runs on a different clock. Paint costs move, so hold the price for the stated window and requote if the client comes back later.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This quote is a fixed price for the work listed and is valid for 30 days.
- The price includes two coats in the colors and sheens named on the quote, and the prep lines listed.
- Paint is ____ (included / supplied by the client). Colors added or changed after the quote are priced as a change.
- Wall damage beyond the patching and crack repair listed, such as water stains or peeling paint, is priced before work continues.
- Work not listed is excluded and is priced in writing before it starts.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Painting quote template FAQ
01Is this painting quote template free?
02How is this painting quote different from the estimate template?
03Can BuildWell send a quote for me?
04Can I give a fixed price on a whole-house interior repaint?
05How do I handle color choices on a painting quote?
06Should cabinet painting be quoted separately from the walls?
Browse by format
- Quote template for PDF
- Quote template for Word
- Quote template for Excel
- Quote template for Google Docs
- Quote template for Google Sheets
- Make a quote online
- Painting estimate template
- Painting invoice template
- Painting receipt template
- Painting software
Guides for painting quotes
Browse by trade
- Plumbing quote template
- Roofing quote template
- Bathroom remodeling quote template
- Kitchen remodeling quote template
- Electrical quote template
- Drywall quote template
- Flooring quote template
- Handyman quote template
- Carpentry quote template
- Concrete quote template
- Deck and fence quote template
- Siding quote template
- Window and door quote template

Price your next painting job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.