Free bathroom remodeling quote template
A fixed-price bathroom remodeling quote with 11 common line items already listed, each with its unit, and terms that say what the price covers. Add your quantities and prices, and send it to be signed.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a bathroom remodeling quote
Every line is one part of the bathroom remodeling job, priced on its own so the client can see exactly what the fixed price covers.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Bathroom gut demolition of fixtures and finishes | each | Demolition is one fixed piece of the job whatever finishes go back, so it’s priced once. |
| Dust containment and floor protection setup | each | Protecting the rest of an occupied home is real labor, and clients want to see it. |
| Rough-in shower valve and water supply | each | Plumbing rough-in happens before the walls close and may be inspected, so it’s its own stage. |
| Install exhaust fan and duct to exterior | each | Ducting the fan outside, not into the attic, is the kind of detail a client should see priced. |
| Hang moisture-resistant drywall | per sq ft | Wet-area board is a different material and price from standard drywall, priced by area. |
| Install cement board on shower walls | per sq ft | Tile backer goes only where tile goes, so it’s measured separately from drywall. |
| Apply liquid waterproofing membrane | per sq ft | Waterproofing is hidden once the tile is up. A line shows the shower was built to keep water out. |
| Set porcelain floor tile | per sq ft | Floor and wall tile go at different speeds, so each has its own per-square-foot line. |
| Set ceramic wall tile | per sq ft | Wall tile is slower than floor tile and covers a different area. |
| Install vanity cabinet | each | The vanity is often the client’s pick. Its own line makes a swap easy to reprice. |
| Set toilet | each | Fixture setting is priced per fixture, whoever supplies the toilet. |
Your bathroom remodeling quote in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Measure the job
Measure the floor tile and wall tile areas in square feet, the shower walls separately, and count every fixture, fan, light and receptacle.
- 3
Fix a price for each line
Enter a quantity and a fixed price on each line the job needs, in each and square feet. Delete the lines you don’t need, and write what the price assumes in the terms.
- 4
Send it for acceptance
Fill in the blanks in the terms, save it as a PDF and send it. The client signs the acceptance line, and the price holds for the work listed.
How bathroom remodeling jobs are quoted
A fixed quote fits a bathroom where the layout stays put: the toilet, vanity and shower go back where they were, and you’ve looked under the sink and in the attic above the fan. Moving a drain or turning a tub into a walk-in shower opens more unknowns. Those jobs may be better sent as an estimate first, then quoted once demolition shows what’s there.
The price stands on choices the client may not have made yet. Tile, the vanity and the toilet can swing the job, so quote them as allowances with a blank for the amount per square foot or per item, and say a different pick changes the price by the difference. Your labor lines stay fixed. Waterproofing and the cement board behind it should never be allowances; they are what you’re standing behind.
Demolition is where a bathroom quote gets tested. Soft subfloor at the toilet, rot under the old tub and mold behind the tile are all things you may find, so the quote should name them as excluded and priced before work continues. Hold the quote for a set time, and check the lead time on the tile before you promise a start date.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This quote is a fixed price for the work listed and is valid for 30 days.
- Tile is included at an allowance of ____ per sq ft; a different choice changes the price by the difference.
- Fixtures, tile and a vanity supplied by the client are installed as provided and carry their own warranties.
- Rot, mold or damaged subfloor found during demolition is not included and is priced before work continues.
- Work not listed is excluded and is priced in writing before it starts.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Bathroom remodeling quote template FAQ
01Is this bathroom remodeling quote template free?
02How is this bathroom remodeling quote different from the estimate template?
03Can BuildWell send a quote for me?
04Can I give a fixed price on a bathroom before demolition?
05How do I write a tile allowance into a bathroom quote?
06Should the glass shower door be on the bathroom quote?
Browse by format
- Quote template for PDF
- Quote template for Word
- Quote template for Excel
- Quote template for Google Docs
- Quote template for Google Sheets
- Make a quote online
- Bathroom remodeling estimate template
- Bathroom remodeling invoice template
- Bathroom remodeling receipt template
- Bathroom remodeling software
Guides for bathroom remodeling quotes
Browse by trade
- Plumbing quote template
- Roofing quote template
- Kitchen remodeling quote template
- Electrical quote template
- Painting quote template
- Drywall quote template
- Flooring quote template
- Handyman quote template
- Carpentry quote template
- Concrete quote template
- Deck and fence quote template
- Siding quote template
- Window and door quote template

Price your next bathroom remodeling job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.