Free drywall quote template
A fixed-price drywall quote with 11 common line items already listed, each with its unit, and terms that say what the price covers. Add your quantities and prices, and send it to be signed.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a drywall quote
Every line is one part of the drywall job, priced on its own so the client can see exactly what the fixed price covers.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Dust containment and floor protection setup | each | Drywall dust travels. Containment is set-up time on every job, priced once. |
| Existing drywall demolition | per sq ft | Tear-out is priced by area and includes bagging and hauling the debris. |
| R-13 fiberglass batt insulation in wall cavities | per sq ft | With the walls open, insulation is priced by area and easy to add or drop. |
| Hang 1/2 in drywall on walls | per sq ft | Hanging is priced by the square foot of board, separately from finishing. |
| Hang 1/2 in drywall on ceilings | per sq ft | Ceilings are overhead and slower than walls, so they carry their own rate. |
| Hang moisture-resistant drywall in wet areas | per sq ft | Wet-area board costs more than standard board and goes only where it’s needed. |
| Install metal corner bead | per linear ft | Outside corners are linear work, priced by the foot. |
| Level 4 three-coat joint finishing | per sq ft | Finishing is its own step with its own rate, and the finish level sets the price. |
| Level 5 skim coat finish | per sq ft | A level 5 finish is an upgrade for walls under strong light or glossy paint. Its own line lets the client choose it. |
| Spray knockdown texture on walls and ceilings | per sq ft | Texture is an add-on per square foot that some clients want and others don’t. |
| Prime new drywall surfaces | per sq ft | Primer may be yours or the painter’s. A line makes clear who’s doing it. |
Your drywall quote in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Measure the job
Measure walls and ceilings in square feet, subtracting large openings, and measure outside corners in linear feet. Note the finish level the client expects.
- 3
Fix a price for each line
Enter a quantity and a fixed price on each line the job needs, in each, square feet and linear feet. Delete the lines you don’t need, and write what the price assumes in the terms.
- 4
Send it for acceptance
Fill in the blanks in the terms, save it as a PDF and send it. The client signs the acceptance line, and the price holds for the work listed.
How drywall jobs are quoted
A drywall quote suits work with a clear boundary: a basement finished from open studs, a garage ceiling, a room of new board after a remodel. You can measure the framing, count the corners and set the finish level before you price it. Repairs are harder to fix a price on, because a small patch can become a section of wall once the damaged board is cut out, so quote patches each with a stated size limit.
The price assumes the framing is ready for board. Studs that are bowed or out of plane, missing blocking at corners and ceilings, and wiring or plumbing that hasn’t passed its rough-in inspection all slow the hang or show through the finish. Say in the quote who is responsible for the framing, and that corrections are priced before you start. On tear-outs, note that what you find inside the wall, such as mold, wet insulation or old wiring, sits outside the price.
Write the finish level and the texture on the quote, not just in conversation. Level 5 and knockdown stay as separate lines so the client can see what each adds. If you can’t start until the electrician and plumber finish, say how long the price holds and that a long delay may mean a revised quote.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- This quote is a fixed price for the work listed and is valid for 30 days.
- Finish level: Level ____. Texture, if listed, matches the sample agreed before work starts.
- Framing, blocking, wiring or plumbing that needs correcting before board goes up is not included and is priced first.
- Painting is excluded unless a line lists it.
- Work not listed is excluded and is priced in writing before it starts.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Drywall quote template FAQ
01Is this drywall quote template free?
02How is this drywall quote different from the estimate template?
03Can BuildWell send a quote for me?
04Can I give a fixed price for a basement drywall job?
05How do I quote a drywall patch when I can’t see the damage behind it?
06Should texture matching be in a drywall quote?
Browse by format
- Quote template for PDF
- Quote template for Word
- Quote template for Excel
- Quote template for Google Docs
- Quote template for Google Sheets
- Make a quote online
- Drywall estimate template
- Drywall invoice template
- Drywall receipt template
- Drywall software
Guides for drywall quotes
Browse by trade
- Plumbing quote template
- Roofing quote template
- Bathroom remodeling quote template
- Kitchen remodeling quote template
- Electrical quote template
- Painting quote template
- Flooring quote template
- Handyman quote template
- Carpentry quote template
- Concrete quote template
- Deck and fence quote template
- Siding quote template
- Window and door quote template

Price your next drywall job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.