Free drywall invoice template
A drywall invoice with 11 common line items already listed, each with its unit, and the terms drywall jobs need. Add your quantities and prices, and send it.
Free, no sign-up. Prices are left blank for your numbers.

What’s on a drywall invoice
Every line is one part of the drywall job, priced on its own so the client can see what each part of the job costs.
| Line item | Unit | Why it’s its own line |
|---|---|---|
| Dust containment and floor protection setup | each | Drywall dust travels. Containment is set-up time on every job, priced once. |
| Existing drywall demolition | per sq ft | Tear-out is priced by area and includes bagging and hauling the debris. |
| R-13 fiberglass batt insulation in wall cavities | per sq ft | With the walls open, insulation is priced by area and easy to add or drop. |
| Hang 1/2 in drywall on walls | per sq ft | Hanging is priced by the square foot of board, separately from finishing. |
| Hang 1/2 in drywall on ceilings | per sq ft | Ceilings are overhead and slower than walls, so they carry their own rate. |
| Hang moisture-resistant drywall in wet areas | per sq ft | Wet-area board costs more than standard board and goes only where it’s needed. |
| Install metal corner bead | per linear ft | Outside corners are linear work, priced by the foot. |
| Level 4 three-coat joint finishing | per sq ft | Finishing is its own step with its own rate, and the finish level sets the price. |
| Level 5 skim coat finish | per sq ft | A level 5 finish is an upgrade for walls under strong light or glossy paint. Its own line lets the client choose it. |
| Spray knockdown texture on walls and ceilings | per sq ft | Texture is an add-on per square foot that some clients want and others don’t. |
| Prime new drywall surfaces | per sq ft | Primer may be yours or the painter’s. A line makes clear who’s doing it. |
Your drywall invoice in four steps
- 1
Add your details
Put in your business name, phone, email and license number once, and save the file as your master copy.
- 2
Copy the signed estimate
Use the same lines and prices the client approved, then add each approved change as its own line.
- 3
Bill what was done
Enter the quantities actually installed, in each, square feet and linear feet, and record any deposit already received under Amount paid.
- 4
Send it
Add the invoice date, a due date and how to pay, save it as a PDF and send it.
How drywall jobs are billed
New-construction and remodel drywall is usually billed in stages: once the board is hung, and again after finishing and texture. Repair work is a single invoice on completion, often subject to a minimum charge.
Bill the square footage actually hung. If the walls came out larger than estimated or the client added a room, show the difference as its own line. Keep the finish level on the invoice so it matches what was agreed.
On repair jobs, a minimum charge covers the separate visits that taping, coating and sanding take. Show it as a line when the work came in under it, so the client understands the price of a small patch. If painting was excluded, say on the invoice whether the repaired areas are primed or left ready for primer, so the client knows what comes next.
Terms already on the template
Fill in the blanks, or change them to match how you work.
- Payment is due within ____ days of the invoice date.
- Quantities are billed as installed.
- Please include the invoice number with your payment.
Done with templates? Let it price the job.
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
- AI estimates priced for your area
- Estimates, invoices, clients and projects
- Clients sign on any phone
- Card and bank payments, no extra BuildWell fee
- iPhone, Android and the web
Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.
Drywall invoice template FAQ
01Is this drywall invoice template free?
02Can I bill a deposit with this template?
03Can clients pay the invoice online?
04Should hanging and finishing be separate lines?
05How do I price drywall patches?
06Which finish level should I quote?
Browse by format
- Invoice template for PDF
- Invoice template for Word
- Invoice template for Excel
- Invoice template for Google Docs
- Invoice template for Google Sheets
- Make an invoice online
- Drywall estimate template
- Drywall quote template
- Drywall receipt template
- Drywall software
Guides for drywall invoices
Browse by trade
- Plumbing invoice template
- Roofing invoice template
- Bathroom remodeling invoice template
- Kitchen remodeling invoice template
- Electrical invoice template
- Painting invoice template
- Flooring invoice template
- Handyman invoice template
- Carpentry invoice template
- Concrete invoice template
- Deck and fence invoice template
- Siding invoice template
- Window and door invoice template

Price your next drywall job today
Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.