BuildWell

Free Change Order Generator

Price the change before you do the work, and get it agreed in writing. Free, no account.

Your business

Prepared for

Details

Line items

Notes and terms

Look

$0.00

Everything stays in this browser. Nothing you type is sent to BuildWell.

How it works

How to use the free change order generator

The free change order generator prices a change to an agreed job, so you can get it signed before the work starts. Reference the original estimate or contract, list what’s added and what’s removed, and say how the change affects the schedule. Credits are entered as negative prices, and the total is the change in price. Below the tool: a worked example, what a change order must say, the mistakes that lead to unpaid extras, and how it ties the estimate to the final invoice.

  1. 1

    Reference the original job

    In the job field, name the project and the estimate or contract the change applies to.

  2. 2

    List the change

    Add each change as a line: added work at its price, and removed work as a negative price.

  3. 3

    Show the effect

    The total is the change in price. In notes, say how it affects the schedule.

  4. 4

    Get it signed

    Download the PDF and have the client sign it before you start the changed work.

How to make a change order: an example

Here is a filled-in change order for a kitchen remodel, made with the generator above. It adds two items, swaps a third, and shows the new contract total in the notes. The business, client and prices are invented for the example.

  1. It names the original agreementThe job name ties the change to estimate #1180 and numbers it in sequence.
  2. Adds and credits on separate linesThe removed backsplash is a negative line, so the client sees the credit and the new cost side by side.
  3. The total is the changeThe total is what this change adds. The notes give the original and the revised contract totals.
  4. Schedule impact in writingFour more working days, and the new target date. Time is part of the change, not just money.
  5. Signed before work startsThe terms make the signature a condition of starting the changed work.
An example change order: Ridgeback Builders, for Tom and Alicia Brenner. Fictional business, client and prices.

Before you send it, check it has

  • The project and the original contract or estimate it changes
  • A change order number and date
  • Each change, with its price (credits as negatives)
  • The total change in price
  • The effect on the schedule
  • Signatures from you and the client

What goes into a strong change order

The parts every change order needs, and why each one matters to the client reading it.

  1. The agreement it changes

    The project and the estimate, quote or contract number. A change order without it is just another price.

  2. A change order number

    Numbered in sequence on each job: 1, 2, 3. It makes the history easy to follow and hard to dispute.

  3. What changes, and why

    Each added, removed or changed item in plain words, and who asked for it or what was found.

  4. A price for each change

    Added work at its price, removed work as a credit. The client sees exactly what each decision costs.

  5. The change in price, and the new total

    What this change adds or removes, and what the contract total is now. A running total keeps surprises off the final invoice.

  6. The effect on the schedule

    Extra days, or a new completion date. Changes take time as well as money.

  7. Everything else stays the same

    A line saying the original terms still apply, so the change order doesn’t reopen the whole agreement.

  8. Signatures before the work

    Yours and the client’s, dated, before the changed work starts.

Common change order mistakes

And how to avoid them, so the document does its job the first time.

Doing the work on a verbal yes

A conversation in the driveway is easy to remember differently. Get the change signed first.

Pricing it after the fact

A price the client sees only on the final invoice is the one most likely to be disputed.

Leaving out the schedule

If the change adds days and the change order doesn’t say so, the original finish date still stands.

No running total

After several changes, clients lose track of the price. Put the revised contract total on each one.

Forgetting the credits

When the client drops an item, show the credit. It builds trust when the added items are priced.

Too many changes on one form

If the client disputes one item, the whole change order stalls. Group related changes, and split the rest.

Change Order templates you can create

The generator has 6 layouts and 12 colors. Here is the example above in three of them; pick yours in “Look” at the bottom of the form.

Classic template
Banner template
Minimal template

Features of the free change order generator

Live preview

The document redraws as you type, in the same layout BuildWell itself sends.

Your logo and colors

Upload a PNG, JPG, SVG or WebP up to 2 MB, and pick from 12 colors.

6 templates

Classic, Headline, Banner, Statement, Minimal and Letterhead.

Tax and discounts

Set a discount and a tax rate. The discount comes off before tax, and the totals are exact to the cent.

Private by default

What you type stays in this browser and is remembered on this device. Nothing is sent to BuildWell.

A PDF with no account

Download the PDF from your browser’s print dialog and send it however you like. No sign-up.

Tracking and follow-up in BuildWell

In BuildWell, a change is a revision of the estimate: the original is kept, the new version is created, and the client signs the revision on their phone. You see when they open it and how many times, and you’re notified when they accept or decline. How the client portal works.

  • Opened, and how oftenSee when the client opens your estimate and how many times.
  • Accepted or declinedGet notified when the client accepts and signs on their phone, or declines.
  • PaidGet notified when the client pays an invoice, and see what’s still owed.
  • Sent from your phoneText or email the link in your own words. Clients need no app or account.
Hall bath remodelClient activity
  • Estimate E-1042 sent by textMon 9:14 AM
  • Opened by the client · viewed 3 timesMon 7:52 PM
  • Accepted and signedTue 8:03 AM
  • Deposit invoice sentTue 8:10 AM
  • Deposit paid by bank transferWed 11:26 AM
Illustration with a fictional job and client.
BuildWell

Skip the typing. Let it price the job.

Describe the job by voice or photos. BuildWell lists the work, prices it for your area, gets it signed on the client’s phone, and turns it into the invoice.

Weekly
$7.99 / week
Billed weekly. Cancel anytime.
  • AI estimates priced for your area
  • Estimates, invoices, clients and projects
  • Clients sign on any phone
  • Card and bank payments, no extra BuildWell fee
  • iPhone, Android and the web
Start free trial
Best value
Annual
$79.99 / year
About $6.67 a month, billed yearly
  • AI estimates priced for your area
  • Estimates, invoices, clients and projects
  • Clients sign on any phone
  • Card and bank payments, no extra BuildWell fee
  • iPhone, Android and the web
Start free trial

Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.

Change Order FAQ

01Is it really free, with no sign-up?
Yes. Fill in the form, download the PDF and send it. You don’t need an account, and what you type stays in your browser: nothing is sent to BuildWell.
02When do I need a change order?
Whenever the scope, price or schedule changes after the client has agreed to the job. Get it signed before you do the changed work.
03How do I show a credit for removed work?
Enter the line with a negative price, like −250 for a fixture the client is no longer buying from you.
04Do I need one for small changes?
It’s safest to put every change in writing, even a small one. Small changes add up, and a signed record is easier than a memory at the end of the job.
05What if the client won’t sign?
Don’t start the changed work. Talk it through, adjust the price or scope if you need to, and continue with the original scope until a change is agreed.
06Should I show the new contract total?
Yes. The generator’s total is the change itself; write the original and revised contract totals in the notes, so the client always knows where the price stands.
07Can I do this in BuildWell?
Yes. In the app, revise the estimate: BuildWell keeps the original, creates the new version, and the client signs the revision on their phone.
08Can I add my logo?
Yes. Upload a PNG, JPG, SVG or WebP up to 2 MB and it appears on the document. Choose a template and a color to match your brand.
09How do I save it as a PDF?
Click Download PDF, then choose “Save as PDF” as the printer in the dialog that opens. On a phone, use Share or Print and save the file.
10Will my details be here next time?
This browser remembers what you typed, so your business details are filled in the next time you open the generator on the same device. Clearing your browser data clears it.

Try BuildWell today

Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.

Start for free →3-day free trial. Cancel anytime.