BuildWell

Free Purchase Order Generator

Order materials in writing: list the items, the job and where to deliver, see the PO as you type, and download a PDF. Free, no account.

Your business

Vendor

Details

Line items

Notes and terms

Look

$0.00

Everything stays in this browser. Nothing you type is sent to BuildWell.

How it works

How to use the free purchase order generator

The free purchase order generator puts a materials order in writing before the supplier pulls a single item. Add the vendor, a PO number, the delivery date and the job, then list each item with its quantity and quoted price. The preview updates as you type, and the PDF is ready to email to the counter. Below the tool: a worked example, what every purchase order needs, the mistakes behind short deliveries and billing disputes, and how a PO links your estimate to the supplier’s invoice.

  1. 1

    Add your business

    Enter your business name, the office address the supplier should bill, your phone and email, and your logo.

  2. 2

    Add the vendor

    Enter the supplier’s name and branch address, and the phone and email of whoever quoted the order.

  3. 3

    Number it and set the delivery date

    Give the order a PO number from your own series, the date you placed it, the date you need it on site, and the job it’s for.

  4. 4

    List the items

    Add a line for each item with the size, grade or product number, the quantity and the quoted unit price. Put delivery on its own line, and set the tax rate if you pay tax on materials.

  5. 5

    Say where and how to deliver

    Under ship-to and delivery, give the site address, where to drop the load, the hours and who to call. Then download the PDF and send it.

How to make a purchase order: an example

Here is a filled-in purchase order for framing and drywall materials on a kitchen remodel, made with the generator above. The builder, supplier, job and prices are invented for the example; your prices come from your own supplier’s quote.

  1. The job on every orderThe Job row ties the order to job 26-114, so the supplier’s invoice lands on the right job’s costs.
  2. Items a counter can pullEach line has the size, grade or sheet type, so nobody guesses between half-inch and five-eighths drywall.
  3. Quoted prices, with the quote numberThe unit prices match the supplier’s quote, and the terms name it. If the invoice comes in higher, the PO records the agreed price.
  4. Delivery as its own lineThe delivery charge is listed, so the total matches the supplier’s bill. The tax rate is an example; use yours.
  5. Where and when to drop itThe site, where the load goes, the hours and who to call: the details that prevent a wasted trip or drywall left in the rain.
An example purchase order: Ironwood Builders to Millbrook Building Supply. Fictional businesses, job and prices.

Before you send it, check it has

  • A unique PO number from your own series
  • Your business and the vendor, with contacts
  • The job the order is for
  • Each item with its size, grade or product number
  • Quantities, units and the quoted unit prices
  • Delivery charge, tax and the order total
  • The delivery date, ship-to address and site contact
  • Who authorized the order

What goes into a strong purchase order

The parts every purchase order needs, and why each one matters to the supplier filling it and the office paying for it.

  1. A PO number in its own series

    Number orders apart from estimates and invoices, like PO-2318. The supplier copies it onto the delivery ticket and the invoice, so you can match all three.

  2. Who’s buying and who’s selling

    Your business as the buyer, with the address to bill, and the vendor with the branch and the person who took the order.

  3. The job it’s for

    A job on every order turns a stack of supplier invoices into job costs you can check against the estimate.

  4. Items that can’t be mistaken

    Size, grade, color, model or product number. “Drywall” isn’t an order; “1/2 in drywall, 4x8 sheet” is.

  5. Quantities and units

    Pieces, sheets, boxes, rolls or cubic yards. A missing unit is how forty boxes become forty pieces.

  6. Agreed prices and a total

    Unit prices from the supplier’s quote, delivery, tax if you pay it, and the total: your record of what you agreed to pay.

  7. Delivery details

    The date it’s needed, the site, where to drop the load, the site’s hours and who to call. Most delivery problems start with one of these missing.

  8. Terms and authorization

    Whether substitutions are allowed, that the PO number goes on the invoice, and who approved the order.

Common purchase order mistakes

And how to avoid them, so the document does its job the first time.

Ordering by phone only

A call leaves no record. When the wrong item arrives, it’s your memory against the counter’s.

No job on the order

Without a job on it, supplier invoices pile up with nothing to say where they belong, and your job costs become guesses.

Vague items

“Lumber for the deck” lets the yard choose the grade, length and treatment. Name the size, grade and count.

Leaving out delivery

If the PO doesn’t say when and where, the load comes when the truck is free and goes wherever the driver can reach.

Paying without checking

Match the supplier’s invoice to the PO and the delivery ticket before you pay. Short shipments and price changes hide easily.

Allowing silent substitutions

A different brand or model can change the job. Say on the PO that substitutions need your written approval.

Purchase Order templates you can create

The generator has 6 layouts and 12 colors. Here is the example above in three of them; pick yours in “Look” at the bottom of the form.

Classic template
Banner template
Minimal template

Features of the free purchase order generator

Live preview

The document redraws as you type, in the same layout BuildWell itself sends.

Your logo and colors

Upload a PNG, JPG, SVG or WebP up to 2 MB, and pick from 12 colors.

6 templates

Classic, Headline, Banner, Statement, Minimal and Letterhead.

Tax and discounts

Set a discount and a tax rate. The discount comes off before tax, and the totals are exact to the cent.

Private by default

What you type stays in this browser and is remembered on this device. Nothing is sent to BuildWell.

A PDF with no account

Download the PDF from your browser’s print dialog and send it however you like. No sign-up.

Tracking and follow-up in BuildWell

BuildWell doesn’t send purchase orders. It gives you the list to order from: when it prices an estimate, each material is matched to a real product at a store near the job, with a quantity and a link to where the price came from. You’re notified when the client accepts and signs on their phone, and then you can copy those lines into a purchase order and order exactly what you priced. How the client portal works.

  • Opened, and how oftenSee when the client opens your estimate and how many times.
  • Accepted or declinedGet notified when the client accepts and signs on their phone, or declines.
  • PaidGet notified when the client pays an invoice, and see what’s still owed.
  • Sent from your phoneText or email the link in your own words. Clients need no app or account.
Hall bath remodelClient activity
  • Estimate E-1042 sent by textMon 9:14 AM
  • Opened by the client · viewed 3 timesMon 7:52 PM
  • Accepted and signedTue 8:03 AM
  • Deposit invoice sentTue 8:10 AM
  • Deposit paid by bank transferWed 11:26 AM
Illustration with a fictional job and client.
BuildWell

Skip the typing. Let it price the job.

Describe the job by voice or photos. BuildWell lists the work, prices it for your area, gets it signed on the client’s phone, and turns it into the invoice.

Weekly
$7.99 / week
Billed weekly. Cancel anytime.
  • AI estimates priced for your area
  • Estimates, invoices, clients and projects
  • Clients sign on any phone
  • Card and bank payments, no extra BuildWell fee
  • iPhone, Android and the web
Start free trial
Best value
Annual
$79.99 / year
About $6.67 a month, billed yearly
  • AI estimates priced for your area
  • Estimates, invoices, clients and projects
  • Clients sign on any phone
  • Card and bank payments, no extra BuildWell fee
  • iPhone, Android and the web
Start free trial

Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.

Purchase Order FAQ

01Is it really free, with no sign-up?
Yes. Fill in the form, download the PDF and send it. You don’t need an account, and what you type stays in your browser: nothing is sent to BuildWell.
02What is a purchase order in construction?
A written order from a contractor to a supplier that lists the materials, quantities, prices and delivery details. Once the supplier accepts it, it’s the record of what was ordered and at what price.
03What’s the difference between a purchase order and an invoice?
You send the purchase order to buy; the supplier sends the invoice to be paid. The invoice should carry your PO number, so you can check that what you’re billed matches what you ordered.
04Should a purchase order include sales tax?
If you pay sales tax to the supplier on materials, set the tax rate so the PO total matches the invoice. Whether a contractor pays tax on materials or buys them for resale depends on your state and the kind of contract, so check with your state’s revenue department.
05Do I need a purchase order for small orders?
Not always. Many contractors skip it for a quick counter pickup and use one for anything delivered, special-ordered, or over an amount they set. The point is a record for the orders that can go wrong.
06What if the delivery is short or the wrong item arrives?
Check the delivery ticket against the PO when the load arrives, write anything missing or different on the ticket before you sign it, and tell the supplier the same day. The PO is your evidence of what you ordered.
07Can I add my logo?
Yes. Upload a PNG, JPG, SVG or WebP up to 2 MB and it appears on the document. Choose a template and a color to match your brand.
08How do I save it as a PDF?
Click Download PDF, then choose “Save as PDF” as the printer in the dialog that opens. On a phone, use Share or Print and save the file.
09Will my details be here next time?
This browser remembers what you typed, so your business details are filled in the next time you open the generator on the same device. Clearing your browser data clears it.

Try BuildWell today

Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.

Start for free →3-day free trial. Cancel anytime.