BuildWell

Free Flooring Calculator

Enter the room, the waste and the coverage on the carton. Get the boxes, the spare and the shoe molding.

Your floor

Results

Floor area180 sq ft
With waste198 sq ft
Boxes10
Coverage you’ll buy200 sq ft
Left over for repairs20 sq ft
Shoe molding (room perimeter)54 lf

Materials only. BuildWell prices them at stores near the job.

How to use it

Steps to use the free flooring calculator

  1. 1

    Measure the room

    Length and width in feet, plus any closets or alcoves as extra square feet.

  2. 2

    Pick the waste

    More for diagonal layouts, patterns and rooms with lots of cuts.

  3. 3

    Enter the box coverage

    The square feet per box printed on the carton. Boxes round up to whole cartons.

How flooring is measured

Flooring is estimated by the square foot and bought by the box. Measure the floor, add a waste allowance for cuts, and divide by the square feet in a box, printed on the carton. Round up to whole boxes, because nobody sells half a carton.

For a rectangular room, the floor is length × width. Measure wall to wall, not baseboard to baseboard, since the flooring runs under the base or shoe molding. For an L-shaped room, split it into rectangles and add them. Closets, alcoves and the strip under a doorway go in too.

Note the transitions while you measure: where the new floor meets a different floor, a threshold, a stair nose or a tub. Each is a piece of trim to order and a few minutes of work.

The flooring formulas

  1. Floor area = length × width, plus closets and alcoves.
  2. Area with waste = floor area × (1 + waste).
  3. Boxes = area with waste ÷ square feet per box, rounded up.
  4. Coverage bought = boxes × square feet per box.
  5. Left over = coverage bought − floor area.

The calculator also gives the room’s perimeter, 2 × (length + width), for the shoe molding or baseboard. Subtract doorways if you want a tighter number.

How much waste to add

Layout A common rule of thumb
Straight lay, simple rectangular room 5 to 10%
Straight lay, many corners, closets or cabinets About 10%
Diagonal lay About 15%
Herringbone, chevron and other patterns 15 to 20% or more

Waste covers the cut ends of each row, the pieces that don’t fit around obstacles, and the occasional damaged board. Long planks waste more per cut than short ones. Patterns waste more because every piece is cut.

For a straight lay in a simple room, 10% is a common allowance.

Boxes and leftovers at different waste factors

A 200 square foot room with 20 square feet in a box.

WasteSq ft to coverBoxes at 20 sq ftLeft over
0%200100 sq ft
5%2101120 sq ft
10%2201120 sq ft
15%2301240 sq ft
20%2401240 sq ft
A 200 sq ft room. Boxes round up, so the spare is often more than the waste you set.

Because boxes round up, the leftover is often more than the waste you planned. That’s fine. Leave it with the client for repairs.

Worked examples

A 15 × 12 bedroom in vinyl plank

180 square feet. With 10% waste, 198 square feet. At 20 square feet a box, 9.9, so 10 boxes. You buy 200 square feet and have 20 left for repairs. The perimeter is 54 feet of shoe molding.

The same room on a diagonal

Diagonal lays waste more, so use 15%: 207 square feet. With a product that has 23.4 square feet in a box, 207 ÷ 23.4 = 8.85, so 9 boxes, or 210.6 square feet, leaving 30.6 square feet spare.

An L-shaped living room in engineered wood

The main room is 20 × 14, or 280 square feet, plus a 6 × 5 alcove, 30 square feet: 310 square feet in all. With 10% waste, 341 square feet. At 24 square feet a box, 14.2, so 15 boxes, 360 square feet, with 50 left over.

Before you install

Most of a floor’s quality comes from what’s under it.

  • Flatness. Floating floors and large tiles need a flat subfloor. Check the maker’s tolerance and fix high and low spots before you start.
  • Moisture. Concrete slabs and crawlspaces can push moisture into a floor. Test, and use the vapor barrier or underlayment the maker calls for.
  • Acclimation. Many products, wood especially, need to sit in the room before they go down. Follow the maker’s instructions.
  • Expansion gap. Floating floors and wood move with the seasons. Leave the gap the maker specifies at walls and fixed objects, and cover it with base or shoe.
  • Old flooring. Carpet, pad, tack strip and old vinyl have to come out, and the floor has to be cleaned of staples and adhesive ridges.

Measuring rooms that aren’t rectangles

Split the floor into rectangles, measure each and add them. An L-shaped room is two rectangles. A room with a bay window is a rectangle plus a small one for the bay; a slightly generous rectangle is fine, since the waste covers it.

For stairs, count the treads and risers and price them as their own line. Stair nosing is ordered by the piece, and stairs take far more time per square foot than open floor.

Where several rooms get the same floor, add them together before rounding up to boxes. Rounding each room separately buys a partial box you don’t need for every room.

Common mistakes

Measuring to the baseboard. The floor goes under it. Measure to the wall.

Forgetting closets. They’re small rooms, and they’re full of cuts.

One box short. A second order can come from a different production run, with a slightly different color. Buy enough the first time.

Skipping transitions and trim. Thresholds, reducers and stair noses are ordered separately and take time to fit.

Ignoring the subfloor. Leveling compound, a layer of underlayment or a few hours of screwing down squeaks can turn up only once the old floor is out. Say how you’ll price it.

From boxes to an estimate

A flooring estimate also covers furniture moving, tear-out and disposal, subfloor repair and prep, underlayment, the floor itself, transitions, base or shoe molding and cleanup.

Tear-out, underlayment, transitions and trim each add time on top of the floor itself, so a room that needs all of them costs noticeably more than its square footage alone suggests. List them as separate lines so the client sees why.

When you estimate flooring in BuildWell, describe the rooms or add a floor plan for the measurements, and it plans each of those as its own line with labor hours. Materials are priced at stores near the job, checked within 30 days, and labor at your metro’s wage plus your overhead and markup. Every quantity, hour and price can be edited before you send it.

BuildWell

Estimate the whole job, priced for your area

Describe the job and BuildWell plans the line items and labor hours, prices materials at stores near the job and labor at your area’s wage, and adds your overhead, markup and tax.

Weekly
$7.99 / week
Billed weekly. Cancel anytime.
  • AI estimates priced for your area
  • Estimates, invoices, clients and projects
  • Clients sign on any phone
  • Card and bank payments, no extra BuildWell fee
  • iPhone, Android and the web
Start free trial
Best value
Annual
$79.99 / year
About $6.67 a month, billed yearly
  • AI estimates priced for your area
  • Estimates, invoices, clients and projects
  • Clients sign on any phone
  • Card and bank payments, no extra BuildWell fee
  • iPhone, Android and the web
Start free trial

Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.

Flooring calculator FAQ

01How much extra flooring should I buy?
A common rule of thumb is 5 to 10% for straight lays in simple rooms, around 15% for diagonal layouts or rooms with many cuts, and more for herringbone and other patterns.
02How many boxes do I need for 180 square feet?
At 10% waste and 20 square feet per box, 198 square feet, so 10 boxes. You’ll have 20 square feet left over for future repairs.
03Should I keep the leftover flooring?
Yes. Leave a box or the spare planks with the client. Matching the same run later is hard, and a few planks make a repair easy.
04Do I measure closets separately?
Add each closet or alcove as its own rectangle in the extra square feet box. Measure to the wall, not to the baseboard.
05Does the floor need to acclimate?
Many products, especially wood, do. Follow the maker’s instructions for how long and at what temperature and humidity before installing.
06How much shoe molding do I need?
The room’s perimeter: twice the length plus twice the width. The calculator shows it in linear feet. Take out door openings you won’t run it across, and buy a little extra for the miter cuts at the corners.

Try BuildWell today

Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.

Start for free →3-day free trial. Cancel anytime.