BuildWell

Free Paint Calculator

Enter the room, the coats and the label’s coverage. Get the gallons for the walls and ceiling.

Your room

Results

Wall area less openings333 sq ft
Wall paint1.9 gal
Gallons of wall paint to buy2
Ceiling area144 sq ft
Gallons of ceiling paint to buy1

Materials only. BuildWell prices them at stores near the job.

How to use it

Steps to use the free paint calculator

  1. 1

    Measure the room

    Length, width and wall height in feet. Choose whether the ceiling is being painted too.

  2. 2

    Count doors and windows

    They come out of the wall area at a standard 3 × 7 and 3 × 5 feet.

  3. 3

    Set coats and coverage

    Two coats is usual. Use the square feet per gallon printed on the can you’re buying.

How paint is estimated

Paint is estimated by area and bought by the gallon. Work out the square feet you’re painting, multiply by the number of coats, and divide by how many square feet a gallon covers. The can’s label gives that coverage.

For a rectangular room, the walls are the perimeter times the height: 2 × (length + width) × height. Take out doors and windows, since you won’t be rolling them. The ceiling is length × width, and it’s usually a different paint, so the calculator keeps it separate.

Trim, doors, cabinets and stairs are estimated differently: trim by the linear foot, doors and windows by the each. They usually take a different paint too, an enamel with more sheen. Price them as their own lines.

The paint formulas

  1. Wall area = 2 × (length + width) × wall height.
  2. Openings = doors × 21 sq ft (3 × 7 ft) + windows × 15 sq ft (3 × 5 ft).
  3. Wall paint = (wall area − openings) × coats ÷ coverage per gallon.
  4. Ceiling paint = length × width × coats ÷ coverage per gallon.
  5. Gallons to buy = each of those rounded up to a whole gallon.

Most labels list roughly 250 to 400 square feet per gallon per coat. The calculator starts at 350. Use the number on the can you’re buying, and lean lower for rough, porous or textured surfaces.

Paint for common rooms

Two coats on walls and ceiling at 350 square feet per gallon, with one door and two windows.

Room (8 ft walls)Walls less openingsWall paint, 2 coatsCeiling paint, 2 coats
10 × 10 ft269 sq ft1.5 gal → buy 20.6 gal → buy 1
12 × 12 ft333 sq ft1.9 gal → buy 20.8 gal → buy 1
12 × 14 ft365 sq ft2.1 gal → buy 31 gal → buy 1
14 × 16 ft429 sq ft2.5 gal → buy 31.3 gal → buy 2
16 × 20 ft525 sq ft3 gal → buy 31.8 gal → buy 2
One door and two windows deducted, 350 sq ft per gallon per coat.

How coverage changes the count

Gallons for 1,000 square feet of wall at different label coverages.

Coverage on the label1 coat2 coats3 coats
250 sq ft per gallon4 gal8 gal12 gal
300 sq ft per gallon3.3 gal6.7 gal10 gal
350 sq ft per gallon2.9 gal5.7 gal8.6 gal
400 sq ft per gallon2.5 gal5 gal7.5 gal
Gallons for 1,000 sq ft of wall.

The spread is wide. The same 1,000 square feet of wall takes 5 gallons for two coats at 400 square feet per gallon and 8 at 250. The surface, the color change and the paint itself all move it.

Worked examples

A 12 × 12 bedroom

Walls: 2 × 24 × 8 = 384 square feet, less one door and two windows, 51 square feet, leaves 333. Two coats at 350 square feet per gallon: 333 × 2 ÷ 350 = 1.9 gallons, so buy 2 gallons of wall paint. The ceiling is 144 square feet: 144 × 2 ÷ 350 = 0.82, so 1 gallon of ceiling paint.

A 16 × 20 living room, new drywall

The walls are 2 × 36 × 8 = 576 square feet, less 51 for openings: 525. New drywall needs a primer coat before two finish coats. The primer, one coat at 350 square feet per gallon: 1.5 gallons, so 2. The finish, two coats: 3 gallons. The ceiling is 320 square feet: two coats is 1.83 gallons, so 2.

A deep accent color

One 14 foot wall, 8 feet tall, is 112 square feet. A deep color can need three coats to cover evenly: 112 × 3 ÷ 350 = 0.96 gallon, so 1 gallon, with very little to spare. Buy a quart extra for touch-ups if the label coverage is optimistic.

What changes how far paint goes

  • The surface. New drywall, bare wood and masonry soak up paint. Primer seals them, so the finish coats cover as the label says.
  • Texture. Knockdown, orange peel and popcorn have more surface than flat walls.
  • The color change. Going from dark to light, or to a deep color, takes more coats. A tinted primer helps.
  • The application. Spraying puts more paint in the air than rolling. Back-rolling after spraying adds labor but evens the finish.
  • The paint. Higher-solids paint builds a thicker coat. The label is the guide.

Choosing the sheen

Sheen Where it’s usually used
Flat or matte Ceilings, and walls where hiding flaws matters more than washing
Eggshell or satin Most living areas and bedrooms
Semi-gloss Trim, doors, kitchens and bathrooms
Gloss Cabinets, railings and accents that get handled

The shinier the paint, the more it shows the wall underneath. A glossy finish on a wall with patches and a level 4 drywall finish will show every repair, which is one reason drywall is sometimes taken to level 5 for glossy paint. Higher sheens are easier to wipe clean, which is why they’re used where hands and water are.

Common mistakes

Forgetting the primer. New drywall, patches, stains and big color changes need it. It’s a coat of paint and a coat of labor.

Estimating trim by area. Baseboard and casing are estimated by the linear foot, doors by the each. Painting them takes far more time per square foot than walls.

Buying exactly what the math says. Leave enough for touch-ups after furniture goes back. Keep the leftover, labeled with the room, for the client.

Mixing batches mid-wall. If you need several gallons of a color, box them: pour them together into one bucket so the color is identical.

Leaving out prep. Moving furniture, protecting floors, washing walls, patching and caulking often take as long as the painting.

From gallons to an estimate

A painting estimate is mostly labor. The paint matters, but the hours of prep, cutting in, rolling, trim and cleanup set the price.

Price the extras as their own lines rather than padding the walls. Cutting in, priming, patching and trim each take real time, so a room with a lot of trim or repairs costs more than its wall area suggests. Doors are easiest to price by the each, and trim by the linear foot.

When you estimate painting in BuildWell, describe the rooms and it plans protection, prep, patching, primer, walls, ceilings, trim and doors as separate lines, each with its own labor hours. Paint and supplies are priced at stores near the job, checked within 30 days, and labor at your metro’s painter wage plus your overhead and markup. You can change any line before you send it.

BuildWell

Estimate the whole job, priced for your area

Describe the job and BuildWell plans the line items and labor hours, prices materials at stores near the job and labor at your area’s wage, and adds your overhead, markup and tax.

Weekly
$7.99 / week
Billed weekly. Cancel anytime.
  • AI estimates priced for your area
  • Estimates, invoices, clients and projects
  • Clients sign on any phone
  • Card and bank payments, no extra BuildWell fee
  • iPhone, Android and the web
Start free trial
Best value
Annual
$79.99 / year
About $6.67 a month, billed yearly
  • AI estimates priced for your area
  • Estimates, invoices, clients and projects
  • Clients sign on any phone
  • Card and bank payments, no extra BuildWell fee
  • iPhone, Android and the web
Start free trial

Both plans include every feature and start with a 3-day free trial. Add a card to start; you’re not charged until the trial ends. Cancel anytime.

Paint calculator FAQ

01How much paint do I need for a 12 × 12 room?
With 8 foot walls, one door and two windows, about 333 square feet of wall. Two coats at 350 square feet per gallon is 1.9 gallons, so buy 2. The ceiling adds about 0.8 gallon, so 1 more.
02How many square feet does a gallon of paint cover?
Most labels list roughly 250 to 400 square feet per gallon per coat. Rough, porous or textured surfaces use more; smooth, primed surfaces use less.
03Do I need two coats?
Usually. Two coats give even color and sheen and hide roller marks. A big color change, a deep color or new drywall can need a primer coat as well.
04Should I prime new drywall?
Yes. Bare paper and joint compound absorb paint differently, and a primer coat evens them out so the finish coats look uniform.
05How much paint for trim and doors?
This calculator covers walls and ceilings. Trim is usually priced by the linear foot and doors by the each, so price them as their own lines.
06Should I buy gallons or a five-gallon bucket?
Once a job needs four or more gallons of one color, a five-gallon bucket is often cheaper per gallon and keeps the color consistent across the walls.

Try BuildWell today

Estimates, invoices, e-signatures and payments in one place, on your phone and on the web.

Start for free →3-day free trial. Cancel anytime.